2
English
Contents
Safety Information
3
Installation Procedure
5
Step 1 Checking and preparing accessories
Step 2 Choosing the installation location
Step 3 Optional: Insulating the body of the indoor unit
Step 4 Installing the indoor unit
Step 5 Purging inert gas from the indoor unit
Step 6 Cutting and flaring the pipes
Step 7 Connecting the assembly pipes to the refrigerant pipes
Step 8 Performing the gas leak test
Step 9 Insulating the refrigerant pipes
Step 10 Installing the drain hose and drain pipe
Step 11 Performing the drainage test
Step 12 Connecting the power and communication cables
Step 13 Optional: Extending the power cable
Step 14 Setting the indoor unit addresses and the installation options
Performing final check and trial operation
Appendix 39
Troubleshooting
k}t㨰䛙~TmGX ptluki]_TW^\\WhTWXUGGGY
YWX_TWYTY_GGG㝘㤸GXXaXXa[X