Troubleshooting
4-6
Samsung Electronics
غ
Forced defrost operation
ـ
Forced defrost operation : Is operation when Frost Formation occurs in the outdoor. (When carried out the service)
غ
Forced oil recovery operation
ـ
Forced oil recovery operation : Oil recovery in the outdoor unit for the purpose of moving, installation if necessary.
Method of Entry
K2 Tact Switch 7 times
Start pattern
Heating Trial Operation pattern
Defrost start
Defrost start : It is after 10 minutes which Safety Start finishes.
Defrost off
General defrost operation conditions are the same as.
Etc.
Defrost shut down and stop the normal pattern of the outdoor unit stop.
Method of Entry
K2 Tact Switch 8 times
Start pattern
Outdoor temperature is more than 10°C : Cooling Auto Trial Operation
Outdoor temperature is less than or equal to 10°C : Heating Auto Trial Operation
Oil recovery start
Oil recovery start : It is after 10 minutes which Safety Start finishes.
Etc.
Oil recovery shut down and stop the normal pattern of the outdoor unit stop.
Summary of Contents for AM080*XV Series
Page 205: ...Samsung Electronics 5 1 5 PCB Diagram and Parts List 5 1 ASS Y PCB MAIN...
Page 208: ...PCB Diagram and Parts List 5 4 Samsung Electronics 5 2 ASS YPCBMAIN HUB AC...
Page 210: ...PCB Diagram and Parts List 5 6 Samsung Electronics ASS YPCBMAIN HUB cont DC...
Page 216: ...PCB Diagram and Parts List 5 12 Samsung Electronics 5 4 ASS YPCBFAN Model 1 FANchassis...
Page 218: ...PCB Diagram and Parts List 5 14 Samsung Electronics ASS YPCBFAN cont Model 2 FAN chassis...
Page 241: ...Cycle Diagram 7 10 Samsung Electronics 7 16 AM240 260 280 300MXVAGC...