79
6. PCB Diagrams
6-2 PCB Diagrams (Sub)
(This Document can not be used without Samsung’s authorization)
①
②
③
②
④
⑥
⑤
⑦
⑧
⑨
⑩
No
.
Parts Number
Part Name
Function and Rule
1
CN01
Door plunger switch, cooktop warming center
,
oven lamp and relay of convection fan connector
This is connector which is connected with Door plunger switch and Door lock switch
. (COM-NO, COM-NC)
2
CN04, CN05
Relay connector
Connector(CN04,CN05) on sub PCB take a role of getting all of the operation of relay on sub PCB to connect with main PCB(CN04,CN05)
.
3
DLB relay(Ry02)
DLB Relay
Circuit is designed to have broil relay or convection relay worked after DLB relay is being worked by Double line break
. (It will not be problem
with reversing the order in insering Orange and Red)
4
Broil relay(Ry03)
Broil relay
Broil relay(Ry03), Bake relay(Ry04), convection relay(Ry05) will be on-of
f working by micom signal after DLB relay is worked
.
(Broil relay : It will not be problem with reversing the order in insering Black and Brown)
(Bake relay : It will not be problem with reversing the order in insering
Yellow and Gray)
5
Bake relay(Ry04)
Bake relay
6
Convection relay(Ry05)
Convection relay
7
R
Y-source relay(Ry01)
Source relay
This is consisted of 15 pin and take a role of getting a cable on keypad to connect with touch PCB
.
8
W/Drawer Relay(Ry06)
and
T03 terminal
W
armer drawer terminal & W
armer drawer relay
This is terminal to connect harness with relay to get heater on warming drawer work
.
9
T02 terminal
Convection terminal
This is the terminal to connect convection heater with convection relay
.
10
T01 terminal
Live 1
Terminal
This is the terminal to supply L1 voltage(120V) with warming drawer relay(Ry06),convection relay(Ry05)
.