SAMSUNG Proprietary-Contents may change without notice
Exploded View and Parts List
11-6
This Document can not be used without Samsung's authorization
1) Screw 4 points to the lower.
(TORQUE : 1.0~1.2)
2) Attach the screw cap to the lower.
1) Assemble the front with the lower.
1) Attach the FPCB to the lower.
2) Screw 6 points to the front.
(TORQUE : 0.8~1.0)
1) Attach the Shield Can to the hook of the board.
2) Screw 1 points to the board.
(TORQUE : 1.0~1.2)
8
7
6
5