Level 2 Repair
Distribution, transmission, or infringement of any content or data from this document without Samsung’s written authorization is strictly prohibited.
Confidential and proprietary-the contents in this service guide subject to change without prior notice.
7-2
1) Assemble PBA on Front Ass'y
2) Assemble FPCB 6point
1) Drive Screws at 12 points with torque
1.5
±
0.1 Kgf/
㎠
1) Assemble Screw cap 4point.
Press this point
7-1-1. Assembly
1
2
3
4
Set a PBA and FRONT Ass'y.
Assemble Screw cap
Assemble Rear and Screw.
Assemble PBA and FPCB
①VT CAM
②Sensor
③SVC LED
⑥SUB PBA
④ LCD
⑤COAX