![background image](http://html.mh-extra.com/html/samsung/lh080xprzas-pz/lh080xprzas-pz_installation-manual_342563022.webp)
22
2. Installation
◇
Pre work on ground – Install the fan on every 5
th
lines (intake, Exhaust)
(P23 ~ P24)
Ex) FHD Zone Screen : 1 cabinet : to work on
Intake Fan/Internal Fan
Exhaust Fan
Exhaust Fan
Intake Fan/Internal Fan
※
Install every fifth line, but if the screen is not a multiple of 5, install it at the top of screen ( )