3–4
Chapter 3
Site Survey with Office DECT 8000
!
Tripod to hold DBS
!
Power cable for AC feeding
!
Tape measure
!
Map of the building
Preparation of
Preparation of
Preparation of
Preparation of SSSSite
ite
ite
ite SSSSurvey
urvey
urvey
urvey (Cell Planning)
(Cell Planning)
(Cell Planning)
(Cell Planning)
Configure the following test environment.
To carry out the site survey, you will need to:
1. Install the BSI card in the DCS or Compact II keyphone system.
2. Connect the DBS and the BSI card using the UTP cable.
3. Connect the power cord to the keyphone system.
4. Set the DECT system parameters.
5. Register selected Office
D
ECT
8000 handsets to the DBS.
Refer to Chapter 4,
Installation
, for full details of all these procedures.
Site Survey Procedure
Before you start cell planning, the coverage estimation for the site should be completed and the
possible DBS locations indicated on the site map. Cell planning is done as follows:
1. At a selected DBS location, set up the test configuration as shown in
Preparation of Site Survey
above.
2. Adjust the tripod to place the DBS near the ceiling or at a height of about 2.5m.
3. Press the
▼
button on the handset until you hear a short beep (after about three seconds) and
then press button “2” within one second of hearing the beep.
4. The handset displays the RSSI value of the DBS (see Figure B-1, handset LCD display [8],
shown in Appendix B).
Office DECT 8000
Office DECT 8000
DBS
2.5M
Keyphone system
AC power cord
Tripod
Summary of Contents for Office DECT 8000
Page 1: ...SAMSUNG Office DECT 8000 Installation and Programming Manual ...
Page 64: ...6 10 Chapter 6 Maintenance ...
Page 65: ...6 11 ...
Page 66: ...6 12 Chapter 6 Maintenance ...
Page 67: ...6 13 ...
Page 68: ...6 14 Chapter 6 Maintenance ...
Page 69: ...6 15 ...
Page 70: ...6 16 Chapter 6 Maintenance ...