OfficeServ 100 Installation Manual
© SAMSUNG Electronics Co., Ltd.
1-1
CHAPTER 1.
Site Requirements
This chapter describes site requirements for OfficeServ 100 system installation.
1.1 Site Requirements
When planning the installation of the OfficeServ 100, choose a site that meets the
following requirements:
Select a location for the KSU(Key Service Unit) that has enough space for easy
installation and has adequate lighting(See Figure 2.1).
Select a location that will minimize cable lengths. See the ‘Table 1.1 Cable
Requirements’.
The equipment must not be exposed to direct sunlight, corrosive fumes, dust, constant
vibration or strong magnetic fields such as those generated by motors and copy
machines.
A direct commercial AC power outlet is required. Do not use extension cords.
Preferably, a dedicated circuit must be used to minimize the risk of other electrical
equipment being connected that could adversely affect system operation.
Ensure that all wires and cable going to and coming from the KSU are properly routed.
Do not cross fluorescent lights or connect lines parallel to AC power line.
The equipment must be located in an environment that will maintain a temperature
range of 32 ~ 104°F(0 ~ 40°C) and a humidity range of 10 ~ 90 % non-condensing.
Allow at least 15 cm clearance on both sides and 15 cm clearance on top of the KSU
to ensure proper ventilation.
Do not install in close proximity to a fire sprinkler head or other sources of water.
Meeting these requirements will help to ensure proper performance and greater life
expectancy of the system.