CHAPTER 2. Installation of RRH-C2A
2-22
© SAMSUNG Electronics Co., Ltd.
Figure 2.16 Installing Hybrid cable (4)
F) Fix the cable to the hoisting wire with a cable tie at regular intervals (within 1 m) to prevent impact or
tension to the upper side of the junction box when lifting the hoist.
Maintain hoisting wire in a straight line, separate the RRH-side cable's curve from the hoisting wire
with 150mm or more distance. And fix cable and wire with cable tie.
(When lifting the hoist, be careful not to apply tension to other areas of the hybrid cable except where
the pulling wire is attached.)
Max. 1 m
Junction Box
(Breakout Point)
Pulling Wire
Hoisting Wire
Max. 1 m
Max. 1 m
Hoisting Wire
Hybrid Cable
More than 150 mm