Ver.
ANNEX B. Feeder Line Work
B-6
© SAMSUNG Electronics Co., Ltd.
2600-00CTEIGAA
4.0
Figure B.2 Feeder Cable Grounding (2)
Protrusion
Clamp Lock
Feeder Line
Ground Kit Clamp
Scissors (knife)
Rubber Tape
Insulation Tape
3) Insert the ground kit clamp into the place from which the feeder line sheath is removed.
4) Pull the clamp lock to the upward so that the lock can be hung on the global protrusion area on the side.
5) Overlap the exposed part of the ground kit clamp using rubber tape (Keep a distance as the half size of
rubber tape) and press it with your hands lightly to make rubber tape adhere well.
6) Wrap the part where the rubber tape is attached using insulation tape two times or more. When cutting
off the tape, cut it off neatly using a cutting device such as scissors or a knife.
3
4
5
6