CHAPTER 2. Installation of RRH-P4
2-66
© SAMSUNG Electronics Co., Ltd.
2600-00CTEIGAA
4.0
3) Attach the junction box (breakout point) to the pole using a stainless steel band.
Tie the cables to the pole 19.69 in. (500 mm) below and 19.69 in. (500 mm) above the
box. (To stabilize the cables near the junction box’s cable input and output holes.)
Figure 2.46 Remaining Hybrid cable (2)
Pole
Junction Box
(Breakout Point)
Hybrid Cable
(from. DU Cabinet)
Power & Optic Cable
(to. RRH-P4)
Cable Tie
Stainless steel Band
Cable Tie
Stainless steel Band
19.69 in. (500 mm)
19.69 in. (500 mm)