5-5
5-3. Spin - Nut Repairing Box
5-3-1. Procedure
1. Insert the jig ® into the spin-nut - .
2. Insert the guide pin ¯ into the groove of the
flange - shaft by rotating it to the right and left.
3.
Insert the connecting rod ° and handle ± into
the sq uare box. Then turn the handle clockwise
on the axis of the small box to disassemble
(Right-hand thread).*
To disassemble the box, give three to four times
of instantaneous shocks to the handle in the
loosening direction, then disassemble it by turning
the handle when the nut is loosened.
4.
To disassemble the box, strike the handle
three or four times-quick shocks to loosen
it-then complete the disassembly by turning the
handle as the nut is loosened.
5. Reassemble in reverse order.
Summary of Contents for SW82ASP
Page 22: ...4 3 ...
Page 23: ...4 4 Memo ...
Page 29: ...5 6 5 4 REASSEMBLY Reassembly procedures are in the reverse order of dissasembly procedures ...
Page 45: ...7 6 7 3 ASSY CASE A0086 U0061 A0282 I0039 I0040 I0040 B0073 B0072 B0012 B0044 B0070 ...
Page 48: ...8 2 Memo ...
Page 49: ...9 1 9 BLOCK DIAGRAM ...
Page 50: ...9 2 Memo ...
Page 51: ...10 1 10 WIRING DIAGRAM ...
Page 52: ...10 2 Memo ...
Page 55: ...12 1 12 SCHEMATIC DIAGRAMS This Document can not be used without Samsung s authorization ...
Page 56: ...12 2 Memo ...
Page 60: ...13 4 Memo ...