Alignments and Adjustments (Mechanical)
Samsung Electronics
4-47
4-4-28 Assembly of Main Slide
1. Install the shaft of Loading ÒRÓ Gear AssÕy into the left of the Main Slide Hole and secure with the
Slit Washer
➁
. (Refer to detail ÒAÓ)
2. Insert the Tension Control Lever
➂
and the Idler Change Lever
➃
into the Main Slide Hole.
(Refer to detail ÒBÓ)
3. After confirming the above items 1, 2 install the Main Slide and secure with tabs (a, b, c).
4. Note : Be sure to assemble the Main Slide while the Loading L/R Gear AssÕy is in unloading position.
LOADING GEAR "R"ASS'Y
LOADING GEAR "L "ASS'Y
1
IDLER CHANGE LEVER
MAIN SLIDE
4
TENSION CONTROL LEVER
3
SLIT WASHER
"a"
"d"
"b"
"C"
"B"
"A"
2
Fig. 4-47 Assembly of Slide Main
Summary of Contents for TB531VCT1X/XSA
Page 2: ...ELECTRONICS Samsung Electronics Co Ltd NOV 1998 Printed in Korea 3SCV11F 3115 ...
Page 8: ...MEMO 2 2 Samsung Electronics ...
Page 144: ...Wiring Diagram 11 2 Samsung Electronics 11 2 SCV11F Wiring Diagram ...
Page 146: ...Schematic Diagrams 12 2 Samsung Electronics 12 2 VCR SYSTEM BLOCK 4 3 1 5 2 6 ...
Page 148: ...Schematic Diagrams 12 4 Samsung Electronics 12 4 VCR POWER BLOCK ...
Page 149: ...Schematic Diagrams 12 5 Samsung Electronics 12 5 TV 1 4 RED POWER LINE BLUE SIGNAL LINE ...
Page 151: ...Schematic Diagrams 12 7 Samsung Electronics 12 7 TV 3 4 RED POWER LINE BLUE SIGNAL LINE ...