Alignments and Adjustments (Mechanical)
4-12
Samsung Electronics
4-2-17 Lever Up Down Ass’y, Gear Center
Ass’y Removal
1. Remove the 2 hooks in the direction of arrow as
shown Fig. 1-20 and lift the Lever Up Down AssÕy
Œ
.
2. Lift the Gear Center AssÕy
´
.
´
GEAR CENTER ASS'Y
Œ
LEVER UP DOWN ASS'Y
4-2-18 Assembly of Lever Up Down
Ass’y, Gear Center Ass’y
1. Insert the Lever Up Down AssÕy
Œ
in the 2
rectangular holes on Main Base.
2. Lift the Lever Up Down AssÕy
Œ
about 35
degree. (Refer to Fig. 1-21)
3. Insert Ring
¨
of the Gear Center AssÕy
´
in the
Guide
ˆ
of the Lever Up Down AssÕy
Œ
.
4. Insert the Gear Center AssÕy
´
in the post
Ø
on
Main Base.
5. Push down the Lever Up Down AssÕy
Œ
for
locking of the Hook
∏
.
Note
:
1. Take care not to separate and loose the Spring
Up Down.
2. When assembling the Gear Center AssÕy, donÕt
push down too much.
MAIN BASE
Œ
LEVER UP DOWN ASS'Y
ˆ
GUDIE
´
GEAR CENTER ASS'Y
¨
RING
ˇ
GEAR
Ø
POST
∏
HOOK 35˚
Fig. 4-20 Lever Up Down Ass’y, Gear Center Ass’y Removal
Fig. 4-21 Assembly of Lever Up Down Ass’y,
Gear Center Ass’y
Summary of Contents for TW14C52S/BWT
Page 89: ...11 Wiring Diagram 11 1 C15A Wiring Diagram Wiring Diagram Samsung Electronics 11 1 ...
Page 90: ...Wiring Diagram 11 2 Samsung Electronics 11 2 C15A Wiring Diagram ...
Page 94: ...Schematic Diagrams 12 4 Samsung Electronics 12 4 VCR POWER BLOCK ...
Page 97: ...Schematic Diagrams 12 7 Samsung Electronics 12 7 TV 3 4 RED POWER LINE BLUE SIGNAL LINE ...