5
<3> Installation
It is very simple to install this industrial cooling machine. The installation for the
first time of the new machine can be carried out by following steps:
1. Open the package to check if the machine is intact and all the necessary
accessories are completed.
2. Open the water supply lid to feed cooling water.
Observing the water level gauge to feed water slowly, be careful not to have the
water overflowed!
3. According to system conditions, please connect the water inlet and outlet pipe
properly.
4. Plug in power, turn on the power switch. (Do not start up without water in the
water tank!)
(1) Power switch turned on, the circulation pump of the chiller starts working. The
first time of operating may cause more bubbles in the pipe leading to a flow
alarming occasionally, but running for a few minutes later, it will go back to
normal.
(2) If the chiller starts for the first time, you must immediately check whether the
water pipe leaks.
(3) Power switched on, if the water temperature is under the set value, it is normal
that fans and other components of the machine do not work. The temperature
controller will automatically control the working conditions of the compressor,
magnetic valve, fans and other parts based on the set controlling parameters.
(4) As it takes a longer time to start over the compressor and other components,
according to different conditions, the time is range from seconds to minutes, so
do not turn on and off frequently.
5. Check the water level in the water tank.
The first starting up of a new chiller will empty the air in the water pipe, causing
a slight water level decline, but in order to keep the water level in the green area,
it is allowed to add adequate water again. Please observe and record the current
water level, and inspect it again after the chiller running for a period of time, if
the water level drops obviously, please re-inspect the water pipeline leakage.
6. Adjust parameters of temperature controller.
CWFL-2000 series use an intelligent thermostat. Normally users do not need to
adjust the parameters. If it is necessary, please refer to page 6 , “Operating
status and parameters adjustment.”
Summary of Contents for CWFL-2000
Page 1: ...CWFL 2000 DUAL TEMPERATURE AND ONE PUMP INDUSTRIAL CHILLER USER MANUAL...
Page 13: ...CWFL 2000 Series 13 changing CWFL 2000...
Page 14: ...CWFL 2000 Series 14 15 16 17 18 22 23 24...
Page 15: ...CWFL 2000 Series 15 1 2 10 3 50Hz 60Hz 4 NORMAL NORMAL 5 50cm 30cm 6 7 8...
Page 16: ...CWFL 2000 Series 16...
Page 17: ...CWFL 2000 Series 17 1 2 3 4 1 2 3 4 5 6 CWFL 2000 18...
Page 22: ...CWFL 2000 Series 22 CWFL 2000 1 2 2 H1 H2 H1 H3 E6 E6 E6 E1 E2 E3 E4 E5 5A 300V...