S&C Instruction Sheet 653- 502
49
Annual Maintenance
− continued
Before departing the site, conduct the following procedures:
¨
Perform general housekeeping to ensure no garbage or debris is in or around the
enclosure.
¨
Bring the PureWave UPS System back online.
¨
Record the system state: _______________________
¨
Close and lock all the enclosure doors and return site keys to the facility supervisor
(if applicable).
¨
Verified By:_________________________ Date: ___________
Maintenance