Optional Disconnect Operation

The optional disconnects for the Scada-Mate SD switch 
are single-phase disconnects. Each disconnect is operated 
separately from the other. Unless specifi ed otherwise, the 
disconnects will be pre-installed to the switch terminal 
pads. See Figure 16 on page 17.

Users will need to implement operating procedures to 

ensure all three disconnects are closed before the switch is 
closed and all disconnects are only opened after the switch 
has been opened. The disconnects mechanically interlock 
with the switch, preventing the closing of the switch unless 
all three disconnects are closed. The disconnects are 
blocked from opening when the switch is closed. Even with 
this feature, users must establish operating procedures to 
ensure all disconnects are open when the switch is open 
before a true three-phase “visible-break” is attained.

To manipulate the disconnect operating ring, follow the 

procedure below using a conventional insulated hookstick 
or S&C Universal Pole and Pole Extension (if required) fit-
ted with a heavy-duty hook-tool such as the S&C Substation 
Prong or equivalent.

STEP  23.  

Verify the switch is open by checking the OPEN/

CLOSE indicator on the end of the switch. See 
Figure 17. Place the LOCAL/ REMOTE switch 
inside the control unit in the 

Local

 position 

before operating the disconnect. Refer to the 
instruction sheet furnished with the control 
unit. Now the switch can only be operated 
locally.

STEP  24.  

Open the disconnect by pulling down on the 

operating ring. See Figure  18. The latch will 
release and the disconnect can be pulled open. 
Disengage the hookstick from the operating ring. 
Repeat with the remaining two disconnects.

The switch is interlocked in the 

Open

state while the disconnects are in the fully 

Open 

position.

Figure 17. The Scada-Mate SD switch in the Open position.

Figure 18. Open the disconnect by pulling the operating ring 
downward with a hookstick.

Operation—For Switches with Power Operator

Operating

ring

Indicator in

Open position

Indicator in 

Open position

Pull operating 

ring downward

Hookstick

Summary of Contents for Scada-Mate SD

Page 1: ...eplacement Instructions and Labels 3 Location of Safety Labels and Tags 4 Safety Precautions 5 Shipping and Handling Packing 6 Inspection 6 Handling 7 Installation Inserting Pole Mounting Hardware 8 S...

Page 2: ...retrieve and refer to this publication Proper Application WARNING The equipment in this publication is only intended for a specific application The application must be within the ratings furnished for...

Page 3: ...cautions are not followed NOTICE NOTICE identifies important procedures or requirements that can result in product or property damage if instructions are not followed Following Safety Instructions If...

Page 4: ...ads may be energized from either side and in any position G 6812 D WARNING Electrocution Hazard Switch and control unit enclosure must be installed and grounded ONLY by qualified personnel G 6815 E WA...

Page 5: ...Switching Systems contain fast moving parts that can severely injure fingers Do not remove or disassemble operating mechanisms or remove access panels on the Scada Mate SD switch base unless directed...

Page 6: ...ese values must be programmed into the remote terminal unit RTU installed with the switch if applicable to apply correction for the unit to unit variations in the sensors The S C Sensor information is...

Page 7: ...EP 2 Secure the lifting slings to the switch before unbolting the switch from the crate Remove all packing materials before lifting the switch Shipping and Handling Lifting bracket extended NOTICE Do...

Page 8: ...erline distance of the holes must be 14 inches 356 mm STEP 4 Insert two inch diameter through bolts not furnished in the holes drilled in Step 3 Secure these bolts loosely with necessary washers and n...

Page 9: ...to uncrate the switch before lifting may cause damage to the switch or personal injury Installing the Optional Pole Band and J Bolts Conduct the following steps to install the optional pole band and...

Page 10: ...ting the end of a number 2 AWG wire or two number 6 AWG wires or wires having an equivalent cross sectional area to the grounding lug on the pole saddle See Figure 6 Insert the ground wire into the gr...

Page 11: ...ors on the terminal pads use the following procedure to prepare their surfaces STEP 10 Do not wire brush Scada Mate SD switch terminal pads They are plated and wire brushing will scratch the protectiv...

Page 12: ...to the terminal pads For installation instructions refer to S C Drawing RD 6794 STEP 13 To install the optional wildlife protection components first prepare the surfaces of the terminal pads and conn...

Page 13: ...Mate SD switches STEP 15 Ground the enclosure by solidly connecting one number 6 AWG wire or wires of equivalent cross sectional area to the ground lug on the back of the enclosure Solidly connect th...

Page 14: ...ol unit Locate the connector receptacle on the front of the switch base and remove the dust cover c Remove the sensor shorting blocks from the receptacle and attach the control cable plug d Secure the...

Page 15: ...rol cable at the drip loop and at the switch connection b Attach the control cable along the length of the utility pole and secure the control cable to the utility pole using suitable guards or clamps...

Page 16: ...Electric Company Use the following procedure to energize the power operated switch STEP 20 After making all user connections to the control unit if applicable in accordance with the S C instruction sh...

Page 17: ...remote operation STEP 22 Place the LOCAL REMOTE switch inside the control unit in the Remote position Refer to the instructionsheetfurnishedwiththecontrolunit The Scada Mate SD switch can now only be...

Page 18: ...ow the procedure below using a conventional insulated hookstick or S C Universal Pole and Pole Extension if required fit ted with a heavy duty hook tool such as the S C Substation Prong or equivalent...

Page 19: ...gency Manual Operation STEP 26 Scada Mate SD Switches are capable of manual interrupter operation In the event of electrical power loss a standard or extendible hookstick is used to open and close the...

Page 20: ...uffix W slide the tap cover backfarenoughtogainaccesstotheterminalpads Then remove the upper and lower terminal pad covers to permit the removal of the phase conductors Retain the covers for reinstall...