8    S&C Instruction Sheet 1076-510

Installation

As shown in Figure 3, the SpeedNet Cell Edge Gateway 

has the following LEDs:

The POWER LED, colored blue, shows the state of power 

input to the SpeedNet Cell Edge Gateway. It is hardware 
controlled and when off implies no power. When lit, it 
indicates that the SpeedNet Cell Edge Gateway has power.

The HEARTBEAT LED, colored orange, indicates vari-

ous stages during the boot-up sequence. When the Speed-
Net Cell Edge Gateway is first powered on, the orange LED 
is off for 15 seconds and then on for 10 seconds. During 
boot-up/initialization, the orange LED blinks rapidly for 2 
seconds (8 blinks) and stays off for 3 seconds. Once boot-up/ 
initialization is complete but the gateway is not yet online, 
the orange LED blinks for 4 seconds (4 blinks) and stays off 
for 1 second. When the gateway is online, the orange LED 
blinks for 2 seconds (2 blinks) and stays off for 3 seconds.

The RESERVED LED, colored yellow, is unused and is 

reserved for future use.

Reserved (Yellow)

Figure 3. SpeedNet Cell Edge Gateway LED indicators.

Heartbeat (Orange)

Power (Blue)

Summary of Contents for SpeedNet

Page 1: ...62 1100 Installation Table of Contents Section Page Section Page Introduction Qualified Persons 2 Read this Instruction Sheet 2 Proper Application 2 Retain this Instruction Sheet 2 Regulatory Informat...

Page 2: ...lication must be selected for a specific application The application must be within the ratings furnished for the selected equipment Retain this Instruction Sheet This instruction sheet should be avai...

Page 3: ...nne ou metteur Cet quipement devrait tre install et actionn avec une distance minimum de 20 centim tres entre le radiateur et votre corps Industry Canada Radiation Exposure Statement This device meets...

Page 4: ...TICE NOTICE identifies important procedures or requirements that can result in product or property damage if instructions are not followed Following Safety Instructions If you do not understand any po...

Page 5: ...e Qualified Persons section on page 2 2 SAFETY PROCEDURES Always follow safe operating procedures and rules 3 PERSONAL PROTECTIVE EQUIPMENT Always use suitable protective equipment such as rubber glov...

Page 6: ...ify the delivering carrier immediately 2 Ask for a carrier inspection 3 Note condition of shipment on all copies of the delivery receipt 4 File a claim with the carrier If concealed damaged is discove...

Page 7: ...t Cell Edge Gateway STEP 2 Connect an Ethernet cable to the SpeedNet Cell Edge Gateway and personal computer PC used for configuring the gateway STEP 3 Connect a power supply to the SpeedNet Cell Edge...

Page 8: ...e Speed Net Cell Edge Gateway is first powered on the orange LED is off for 15 seconds and then on for 10 seconds During boot up initialization the orange LED blinks rapidly for 2 seconds 8blinks ands...

Page 9: ...ines no crossover cables required and auto negotiate for 10 Mbps or 100 Mbps data rates as required by the connected device Figure 4 SpeedNet Cell Edge Gateway RS 232 interface pinout Pin Function Des...

Reviews: