background image

2

  S&C Instruction Sheet 695-545

Introduction

Qualified Persons

  WARNING

Only Qualified Persons who are knowledgeable in the installation, operation, and 
maintenance of overhead and underground electric distribution equipment, along 
with all associated hazards, may install, operate, and maintain the equipment 
covered by this publication. A Qualified Person is someone who is trained and 
competent in:
•  The skills and techniques necessary to distinguish exposed live parts from nonlive 

parts of electrical equipment

•  The skills and techniques necessary to determine the proper approach distances 

corresponding to the voltages to which the Qualified Person will be exposed

•  The proper use of special precautionary techniques, personal protective equip-

ment, insulated and shielding materials, and insulated tools for working on or near 
exposed energized parts of electrical equipment

These instructions are intended ONLY for such Qualified Persons. They are not 
intended to be a substitute for adequate training and experience in safety proce-
dures for this type of equipment.

Read this  

Instruction Sheet

NOTICE

Thoroughly and carefully read this instruction sheet and all materials included in 
the product’s S&C Instruction Handbook before installing or operating your S&C 
Vista SD Underground Distribution Switchgear. Familiarize yourself with the Safety 
Information and Safety Precautions on pages 4 through 6. The latest version 
of this publication is available online in PDF format at 

sandc.com/en/support/

product-literature/.

Retain this  

Instruction Sheet

This instruction sheet is a permanent part of your S&C Vista SD Underground Distribution 
Switchgear. Designate a location where you can easily retrieve and refer to this publication. 

Proper Application

  WARNING

The equipment in this publication must be selected for a specific application. The 
application must be within the ratings furnished for the equipment. Ratings for the 
Vista SD Underground Distribution Switchgear are listed in the ratings table in 
Specification Bulletin 695-33. The ratings are also on the nameplate affixed to the 
product. 

Summary of Contents for Vista SD

Page 1: ...Instructions and Labels 4 Location of Safety Labels 5 Safety Precautions 6 Components 7 Operation Manually Opening or Closing Visi Gap Load Interrupter Switches and Visi Gap Fault Interrupters 9 Closi...

Page 2: ...ot intended to be a substitute for adequate training and experience in safety proce dures for this type of equipment Read this Instruction Sheet NOTICE Thoroughly and carefully read this instruction s...

Page 3: ...user s claim All other warranties whether express or implied or arising by operation of law course of dealing usage of trade or otherwise are excluded The only warranties are those stated in Price Sh...

Page 4: ...ecautions are not followed NOTICE NOTICE identifies important procedures or requirements that can result in prod uct or property damage if instructions are not followed Following Safety Instructions I...

Page 5: ...locked immediately call electric company G 6398 B DANGER Hazardous voltage more than 4000 volts Failure to follow these instructions will likely cause shock burns or death ALWAYS consider all circuits...

Page 6: ...a door The use of undue force may damage the door latching mechanism 7 Safety Labels Do not remove or obscure any of the DANGER WARNING CAUTION or NOTICE labels 8 ENERGIZED BUSHINGS Always assume the...

Page 7: ...of load interrupter switches and fault interrupters are optionally available They can be decoupled from the operating mechanisms to permit testing without changing the positions of the switches or fau...

Page 8: ...nit shown Catalog Number Suffix 924313 E11 Manual handle Fault indicator viewing window optional Potential indication feature optional Overcurrent control Operating mechanism Visible open gap isolatin...

Page 9: ...t wrench or tool a hex headsocketwrenchortoolwhencatalognumber suffix N is specified into the latching mechanism Rotate the wrench or tool 60 counterclockwise to unlatch the doors See Figure 3 NOTICE...

Page 10: ...ion of the manual operating handle STEP 5 Retrieve the manual operating handle from its storage location at the top left side of the switchgear assembly See Figure 5 STEP 6 Pull the knob forward at th...

Page 11: ...way to the stops See Figure 7 a To open the load interrupter switch or fault interrupter rotate the handle counterclockwise b To close the load interrupter switch or fault interrupter rotate the hand...

Page 12: ...door is closed To close a door equipped with the Penta Latch Mechanism place one hand at the midpoint of the door front near the edge and firmly push the door closed When the latch points are positive...

Page 13: ...EP 1 Check the POSITION indicators to confirm the fault interrupter has tripped See Figure 14 STEP 2 Retrieve the manual operating handle from its storage location Attach the handle to the shaft of th...

Page 14: ...TEP 8 Check the POSITION indicators to confirm the fault interrupter is closed See Figure 19 STEP 9 Confirm the position of the isolating disconnect using the large viewing window See Figure 20 STEP 1...

Page 15: ...of a load interrupter switch or fault interrupter insert a padlock through the operating mechanism and the center hole in the locking collar See Figure 21 Figure 21 The load interrupter switches or fa...

Page 16: ...etroleum based solvents should not be used on or around Vista SD Underground Distribution Switchgear STEP 2 Unscrew the aluminum cap covering the Potential Indication feature See Figure 22 STEP 3 Atta...

Page 17: ...be phased as follows a Set the voltmeter for volts ac b Connectoneofthetestprobesofthevoltmeterto the neutral jack of the way to be phased c Place the other test probe on each of the test jacks in tur...

Page 18: ...ng different phases of the two ways the voltage should be 1 7 to 2 times the phase to neutral voltage measured in Step 3 See Figure 25 b d Keep the test probe on Test Jack 1 of the first way and move...

Page 19: ...r sources including backfeed test for voltage and properly ground 4 Always assume the bushings are energized unless proved otherwise by test or by visual evidence of an Open Circuit condition at the i...

Page 20: ...ve green finish 9991363 493 for seafoam green 9991363 488 for equipment green and 9999 061 for red oxide primer See Figure 27 No other finish or primer is approved The area to be touched up should be...

Page 21: ...withstand tests The presence of these values does not imply a dc withstand rating or performance requirements for the switchgear A dc withstand design test is speci fied for new equipment because the...

Page 22: ...tance test or a maintenance test The cable system must be taken out of service for this testing An acceptance test is a field test made after installa tion of the power cable system including terminat...

Page 23: ...cable applying the VLF test source discharging the cable and regrounding the cable WARNING When VLF cable testing has been completed or has been interrupted you must discharge the cable sys tem and t...

Page 24: ...ed NO C Vacuum interrupter closed NC D Vacuum interrupter open NO E Vacuum interrupter open NC F Isolating disconnect closed NO G Isolating disconnect closed NC H Isolating disconnect open NO J Isolat...

Reviews: