⑤
Input PtID of target point P3,
and repeat the last procedure.
Input offset
PtID
[ENT]
Point 1
:
20
Input Pt-Offset!
+
【
Distance- Offset
】
Input Baseline!
Point 2
:
21
OffsPt:
:
8
AB
MEAS CALC SEARCH
↓
⑥
Press [F2] ([CALC]) to
y the result.
o stake out this point, input
esult menu, press
[ESC] to return to data
inputting menu, and re-input
the data.
[F2]
【
COGO New Point
】
New Point : --- --- ---
Y/E
:
40.000 m
40.000 m
displa
T
new PtID, and press [F1] to
start staking out .
※
2)
To save the data, press [F4].
To quit the r
X/N
:
STAKE
RECORD
※
1) There are four methods to input
section
“
”
※
2) Th
the known P
last
5.8.1.1Traverse .
e stake-out operation of
ar to that
previously. Please refer to “5.8.1.1
tID. Please refer to procedure
②
of the
is simil
of Traverse”, which has been introduced
Traverse”.
5
FFSET
.8.3.2 POINT-O
The known data: P1 Baseline start point
P2 Baseline end point
a Difference in length/ abscissa (HD)
b Lateral deviation / ordinate (Offset)
The unknown data: P3 Lateral point
101
Summary of Contents for STS-750
Page 6: ...6...