①
In Programs menu, press
Height
PAGE
[F3]
F1 Surveying (1)
F2 Stake Out (2)
F3 Free Station (3)
F4 COGO (4)
【
Programs
】
1/3
▼
[PAGE] to turn to Page 2,
and press [F3] to start
Remote
measurement.
【
Programs
】
2/3
2 Area(Plan) (2)
(3)
rc (4)
F1 Tie Distance (1)
F
F3 Remote Height
F4 Reference Line/A
②
Set job, measurement
station and backsight
rientation, and press [F4] to
art area measurement.
introduced
previously, it will not be
repeated here.).
【
Rem
[
[
(3)
(4)
o
st
(As the method of setting
job, station and orientation
have been
ote Height
】
[ * ] F1 Setting Job (1)
* ] F2 Setting Station (2)
* ] F3 Set Orientation
F4 Start
【
Base Poin
Sight Meas B
③
Input PtID of base point, Input base
PtID
and press [ENT].
+
t
】
ase Pt
!
Pt
:
10
1.000 m
R.HT
:
[ENT]
:
---.--- m
Ⅰ
All DIST RECORD
↓
heig
【
Base Point
】
Sight Meas Base Pt
!
④
Input the known prism
ht (Here, take h=1.500
for example), and press
[ENT].
Input1.500
+
[ENT]
Pt
:
10
R.HT
:
1.500 m
:
---.--- m
Ⅰ
All DIST RECORD
↓
⑤
Collimate the prism center
【
Remote Point
】
and
([DI
([RECORD]) to start
measurement. The position
of the base point is set.
[F1]
[F3]
Sight Meas REM Pt!
press [F1] ([All]) or [F1]
ST]) + [F2]
or[F2]
+
BasePt
:
10
R.HT
:
1.500 m
:
---.--- m
Ⅰ
BasePt SAVE
112
Summary of Contents for STS-750
Page 6: ...6...