⑦
Collimate the current prism,
[F2]
1/3
press [F2] ([DIST]) to start
measurement, and calculate and
display the stake-out factor
offsets of between target point
and stake-out point.
【
Alignment S-O
】
▼
PtID C100+0.0
R.HT 2.000 m
△
Hz
:
-85°51
′
32
″
△
:
-25.369 m
△
:
2.364 m
Ⅰ
All DIST VIEW
↓
⑧
Rotate the telescope until
△
Hz shows an angle offset of
0°00
′
00
″
, and order the
surveyor to move the prism.
·
Arrowhead’s meanings
:
:
From measurement station,
move the prism leftward.
:
From measurement station,
【
Alignment S-O
】
1/3
▼
move the prism rightward.
PtID
:
C100+0.0
R.HT
:
2.000 m
△
Hz : 00°00
′
00
″
△
:
-15.369 m
△
:
2.364 m
Ⅰ
All DIST RECORD
↓
⑨
Set prism on zero direction
based on the telescope and
collimate it, press [F2]
([DIST]) to start measurement
and calculate the stake-out
factor offset between prism
point and stake-out point.
Arrowhead direction is the
direction the prism is to moved.
[F2]
:
C100+0.0
【
Alignment S-O
】
1/3
▼
PtID
R.HT
:
2.000 m
Hz
△
:
00°00
′
00
″
△
:
-10.369 m
△
:
2.364 m
Ⅰ
All DIST RECORD
↓
⑩
Move the prism forward or
backward according to
arrowhead untill
△
shows a distance value of 0 m.
·
Arrowhead’s meanings
:
:
To move the prism toward to
the measurement station.
:
To move prism further away
from the direction of
measurement station.
In the process of stake-out, if
fine (
r) or tracking
【
Alignment S-O
】
1/3
▼
PtID
:
C100+0.0
measurement mode is selected,
the facotr offset of between
prism point and stake-out point
can be displayed at real time,
which is of great convenience.
R.HT
:
2.000 m
△
Hz
:
00°00
′
00
″
△
:
0.000 m
△
:
2.364 m
Ⅰ
All DIST RECORD
↓
151
Summary of Contents for STS-750
Page 6: ...6...