OPERATIONAL STEPS
OPERATION
DISPLAY
①
Input (or select) the side
chainage to be slope staked out.
ress [F4] ([
↓
]) to turn to Key
age 2, and press [F1]
PE]) to start slope
4]
1]
P
P
([SLO
stake-out .
[F
[F
【
Alignment S-O
】
Chain.
:
100.000 m
Offset
:
0.000 m
iff
:
0.000 m
R.HT
:
1.598 m
HtD
STAKE L_OFFS R_OFFS
↓
SLOPE +CHAIN -CHAIN
∣←
②
Input the ratio of left and
right slopes to be filled (or
igged). After finishing
【
Slope Stake Out
】
(1
:
n)LEFT
d
inputting one item, press
[ENT]. When all data are
imput, select the left (or right)
slope to be staked out.
Cut
:
:
1.000
1.350
Fill
Fill
:
(1: n)RIGHR
Cut
:
1.200
1.650
LEFT RIGHT
③
Enter into the screen of
Slope Stake Out function, input
prism height, collimate the
point that is to be intercepted
near the slope, and press [F2]
([DIST]) to start slope
stake-out. The system will
select an approriate slope from
the data input in last procedure.
e,
measurement point
and calculated point. The
mothod to stake out slope is
[F2]
Suppose to set the height of
measurement point as the
horizontal datum plan
calculate the intercepted point.
The list displays the offset
between
【
Slope Stake Out
】
PtID
:
C100+10.0S
R.HT
:
2.000 m
△
LOff
:
---.--- m
△
TOff
:
---.--- m
Ⅰ
All DIST RECORD
↓
154
Summary of Contents for STS-750
Page 6: ...6...