Here, take setting a new
construction site for example:
press [F3].
④
Input the Start PtID of
construction site and prism
height, collimate the prism
center, press [F2] ([DIST]) +
[F3] ([RECORD]) to start
measurement.
※
1)
Input start
PtID of site
+
[F2]
+
[F3]
t!
【
Defining new Site
】
Sight Meas Start P
StartP
:
1
:
2.000 m
R.HT
:
---.--- m
Ⅰ
:
---.--- m
All DIST RECORD
↓
EDM ENH
∣←
⑤
Input end PtID of end site
) + [F3]
([RECORD]) to measure the
end point of construction site.
PtID
+
[F2]
+
[F3]
Sight Meas End Pt!
and prism height, collimate the
prism center, and press
[F2]([DIST]
Input end
【
Defining new Site
】
StartP
:
1
End Pt
:
2
1.500 m
R.HT
:
:
---.--- m
Ⅰ
:
---.--- m
All DIST RECORD
↓
⑥
After setting the site, enter
into Stake Out menu.
【
Stake Out
】
PtID
:
--- ---
R.HT
:
1.500 m
Ln
:
---.--- m
Of
:
---.--- m
H
:
---.--- m
All DIST CHECK
↓
DIST RECORD SHIFTl
∣←
et Construction Site via Known Point
int to be measured here is known point and X,Y coordinates have been input, the program will
of offset value.
OPERATIONAL STEPS
OPERATION
DISPLAY
S
If the po
display the length calculated, the practical length measured, and the dialog
OPERATIONAL STEPS AS FOLLOWS
:
line
fun
defining start point,press[F4]
display the second page soft
ey.
Input start
+
[F2]
+
[F3]
【
Defing new Site
】
Sight Meas Start Pt!
①
Enter setting new
StartP
:
1
ction.Entry dialog box of PtID of site
End P
:
2.000 m
:
-- m
Ⅰ
---. -
:
---.--- m
All DIST RECORD
↓
EDM ENH
k
∣
←
156
Summary of Contents for STS-750
Page 6: ...6...