③
After inputting ENH, press
[F4] ([OK]) to enter into Stake
Out menu. The program
automatically set the PtID to
rts to
stake out the input points.
※
1),
※
2)
[F4]
“DEFAULT”, and sta
【
Stake Out
】
1/3
▼
FIND :
PtID
:
DEFAULT
Type
:
Known
△
Hz
:
-85°51
′
31
″
△
:
2.055 m
Ⅰ
△
:
﹉
.
﹉
m
B&D MANUAL |
←
※
1) [MANUAL]: Data that was input will not be saved in the job.
※
2 Method to stake-out is introduced from 5.6.2.
The s
en:
[DIST]: S
ent and calculation of
[R
splayed values.
5.6
oft keys below the scre
tarts measurem
ECORD] Saves the di
.2 Polar Stake Out
the stake-out elements.
In the picture, 1: Actual 2: Poin
Normal indication of polar stake out offset
△
Hz
Angle offset
:
positive if point to be setout is to the right of the actual direction.
△
t
s
e
to be tak d out
s.
Longitudinal offset: positive if point to be staked out is further away.
△
Height offset: positive if point to be staked out is higher than measured point.
OPERATIONAL STEPS
OPERATION
DISPLAY
①
Set the seires of data of
stake-out point. Pres
【
Stake Out
】
1/3
▼
FIND : *
s
PtID
:
5
Type
:
Known
△
Hz
:
-85°51
′
31
″
navigation key
to select
the point to be staked out. You
can also call up it from the job
by inputting the stake-out
△
:
2.055 m
Ⅰ
△
:
﹉
.
﹉
m
PtID
in Pt Search menu.
All DIST RECORD
↓
76
Summary of Contents for STS-750
Page 6: ...6...