【
ake Out
】
2/3
▼
PtID
:
5
St
②
Press [PAGE]to turn to Page
2, and press navigation key
the
Type
:
Meas.
PAGE
+
R.HT
:
2.000 m
L Off
:
﹉
.
﹉
m
to move to R.HT item. Input
△
prism height.
Input R.HT
△
T Off:
﹉
.
﹉
m
Ⅰ
△
H
:
﹉
.
﹉
m
All DIST RECORD
↓
③
,
ut f
[F2]
【
Stake Out
】
▼
1/3
FIND : *
Collimate on the prism
press [F2] ([DIST]) to start
measurement and calculate the
stake-o
actor offset between
measurement point and
stake-out point.
PtID
:
5
Type
:
Known
△
Hz
:
-85°51
′
31
″
△
:
2.055 m
Ⅰ
△
:
-0.019 m
All DIST RECORD
↓
④
Rotate the telescope until
e angle difference is 0
°
00
′
00
″
and notify the surveyor to
th
move the prism.
·
Arrowhead means
:
:
Westing the prism to the
station.
:
Easting the prism to the
【
Stake Out
】
1/3
▼
station.
FIND : *
PtID
:
5
Type
:
Known
△
Hz
:
0°00
′
00
″
△
:
2.055 m
Ⅰ
△
:
-0.019 m
All DIST RECORD
↓
⑤
Set the prism at 0
°
direction of telescope and
collimate on it. Press [F2]
([DIST]) to start measurement
and calculate the stake-out
ctor offset between the prism
and stake-out point.
[F2]
fa
【
Stake Out
】
1/3
▼
FIND : *
PtID
:
5
Type
:
Known
△
Hz
:
0°00
′
00
″
△
:
2.055 m
△
Ⅰ
:
-0 .019 m
All DIST RECORD
↓
⑥
Move the prism northing or
southing according to the
arrowhead until the
“△
”
displaying 0 m.
·
Arrowhead means
:
: Southing the prism to the
station
: Northing the prism to the
station.
:
【
Stake Out
】
1/3
▼
FIND *
PtID
:
5
Type
:
Known
△
Hz
:
0°00
′
00
″
△
:
0.000 m
Ⅰ
△
:
-0 .019 m
All DIST RECORD
↓
77
Summary of Contents for STS-750
Page 6: ...6...