prism closing to
easurement station.
m
⑩
Move prism forward/
backward according to the
arrowhead until
“△
”
displays 0 m.
※
4)
H is positive
:
it needs to
e filled. The height is the
it needs to
be filled. The depth is the
value displayed.
ID
:
5
△
b
value diplayed.
△
H is negative
:
【
COGO Stake Out
】
Pt
.Ht
:
1.923 m
R
HT
:
0.000 m
△
Hz
:
50
°
10
′
50
″
△
:
1.966 m
Ⅰ
△
:
2.369 m
All DIST RECORD EDM
※
1)If staking out directly without inputting PtID of new point, the procedure will display
“
nch Traverse function again, press [ENC]
※
3)The Traverse result is the plane value. Therefor
ed,
input it seperately.
To change EDM setting, press [F4].
※
4) Selecting Fine (r) or tracking measurement method to stake out can display the factor offset
between prism point and stake-out point on real time.
Invalide PtID!
”
※
2)If to lau
.
e, in the process of stake-out, if H/Z is need
.8.1.2 Inverse
5
The known data:
P2 The second known point
The unknown data:
α
Direction from P1 to P2
d1
ance between P1
d2 Horizontal distance between P1 and P2
d3 Height distance between P1 and P2
OPERATIONAL STEPS
OPERATION
DISPLAY
P1 The first known point
Slope dist
and P2 .
①
In Inverse & Traverse
manu, press [F2], and enter
into Inverse function.
[F2]
【
Inverse & Traverse
】
F1 Traverse
F2 Inverse
92
Summary of Contents for STS-750
Page 6: ...6...