5. HANDLING
The CAD-COMPACT ECOWATT units are delivered fixed with screws to the pallets.
The handling machines will be adapted to the load and the lifting conditions. In all cases, the lifting will be done at the
device’s base. The centre of gravity is located at the centre of the unit. The device must be carefully manipulated only in
the horizontal position.
6. INSTALLATION
6.1. INTRODUCTION
All models are designed to be installed hanging from the ceiling or located behind a false ceiling. When installing the
unit, is necessary to distribute the unit weigh between the 4 supports existing in the units. Using studded rods (Ø 8 mm),
it can be secured to the ceiling and levelled:
Check the distances between supports in the diagrams of the section: “Dimensions and free dimensions for mainte-
nance”.
The installer must make sure that the ceiling structure and the securing elements can bear the weight of the device,
taking into account that it is a dynamic load.
To prevent the transmission of vibrations from the unit to the rest of the installation, it is necessary that the installer use
specific isolation elements, as well as flexible couplings between the water connections and the pipelines.