background image

40

11. OPERATION ANOMALIES

ANOMALY

CAUSE

SOLUTION

Difficult to start. 

Reduced power supply voltage.
Insufficient static torque of motor.

Check motor specification plate.
Close the air inlets to reach the maximum speed.
Change the motor is necessary.
Contact the 

S&P

 Post-Sales service.

Insufficient airflow.
Insufficient pressure.

Blocked pipes and/or inlet points closed.
Fan obstructed.
Filter overloaded.
Insufficient rotation speed.
Exchanger package blocked.

Clean inlet tubes.
Clean fan.
Clean or replace filter.
Check power supply voltage.
Clean the exchanger.

Reduction in performance 
after a period of acceptable
operation.

Leaks in the circuit before and/or after 
the fan.
Damaged roller.

Check the circuit and restore original conditions.
Check the impeller and if necessary, replace with an original spare part.
Contact the S&P post sales service.

New air temperature too 
cold.

Outside air -5º C or less.
Models (CADB-DI): Thermal protectors 
Support resistances open.

Insertion of post-heating resistances.
Contact the S&P post sales service.
Reset by pushing the button RESET, all the thermal protectors of the 
resistance.

Insufficient performance of 
the exchanger

Fins dirty.

Clean the exchanger.

Formation of frost on the 
exchanger.

Outside air below -5º C.

Insertion of post-heating devices (anti-ice).
Contact the S&P Customer Advice service.

Air pulsation. 

Fan working in flow conditions almost 0.
Flow instability, obstruction or
bad connection. 

Modification of the circuit and/or replacement of the fan.

There is water inside the 
unit.

Drain clogged or wrongly dimentioned.

Check if exists a body/object obstructing the passage of water and 
remove it. Verify that the drain trap exists and is correctly sized 
according to the instructins of this manual.

Only DC versions. Internal breakage 
of water coil.

Isolate the battery using the isolation valves. 
Repair the leak/ Replace the battery.

Only DC version. The water coil is 
being used for cooling purpose with 
cold water.

The CADB-N DC heat recovery can be used just for post-heating 
function with hot water.

Clean and/or readjust the inlet channels.
Operate the electronic regulator, increasing the minimum speed 
(insufficient voltage).
Contact the S&P Customer Advice service.

10.3. DRAINPIPE FOR CONDENSATE

Regularly inspect the drainpipe for condensates to make sure it is not blocked, if this is the case, remove the obstruction.

10.2 HEAT EXCHANGER

The access to the heat exchanger is performed by the bottom (horizontal CADB-N models 05 to 30), for the top part (horizontal models of 
CADT-N 45 to 80) and for lateral part (vertical models). Using a screwdriver, remove the access panels to the heat exchanger.
To release the heat exchanger, loosen the screw that 

x the heat exchanger to the internal structure.

FALLING OBJECTS
By loosening the screws that hold the panels, they will be released. In units installed in ceiling, pay special 
attention to this operation to prevent the fall of panel. During the maintenance signaling the area below the heat 
recovery unit and prevent personnel access to it. 

3

Not manipulate the heat exchanger for the 

nned area.

Summary of Contents for CADB-N-D

Page 1: ...C CADT N D DI DC Recuperadores de calor Heat recovery units Recuperateurs de chaleur Manual de instalaci n Instrucciones de uso Installation manual Instructions for use Instructions de montage et d ut...

Page 2: ......

Page 3: ...7 5 3 Modelos CADB CADT N DI 05 08 12 18 23 30 45 55 80 A D H 13 7 5 4 Modelos CADB CADT N DI 05 08 12 18 23 30 45 55 80 A D H BP 14 7 5 5 Modelos CADB CADT N DC 05 08 12 18 23 30 45 55 80 A D H 14 7...

Page 4: ...realizado el an lisis de los riesgos del producto como est previsto en la Directiva de M quinas Este manual contiene la informaci n destinada a todo el personal expuesto con el n de prevenir posibles...

Page 5: ...uentre distribuido entre todos los puntos de apoyo para evitar deformaciones El instalador debe asegurarse de que la estructura del techo as como la jaci n al mismo pueden soportar el peso del aparato...

Page 6: ...200 CADB CADT N D 08 850 850 360 180 228 250 CADB CADT N D 12 1050 1050 500 250 278 315 CADB CADT N D 18 1150 1150 500 250 303 355 CADB CADT N D 23 1300 1300 530 265 340 355 CADB CADT N D 30 1500 150...

Page 7: ...je de dos filtros 1 Aflojar las palometas que sujetan los dos soportes porta filtros 2 Retirar los soportes porta filtros 3 Instalar el segundo filtro en su ubicaci n Asegurarse que el sentido del air...

Page 8: ...tos de la instalaci n V lvula de llenado autom tico para garantizar que la instalaci n hidr ulica no se quede nunca sin agua Presostatos para detectar la falta de presi n de agua Llaves de corte de pa...

Page 9: ...I N 230V Monof sico 230V Monof sico CONEXIONADO PARA REGULACI N ELECTR NICA A 3 HILOS NEGRO BLACK AZUL BLUE AMARILLO VERDE YELLOW GREEN MARR N BROWN N L MOTOR N L 230V NEGRO BLACK AZUL BLUE AMARILLO V...

Page 10: ...EGRO BLACK AMARILLO VERDE ROJO RED AMARILLO YELLOW BLANCO WHITE YELLOW GREEN AZUL BLUE MARR N BROWN MOTOR 400V CONEXIONADO DE F BRICA T TP R S TP MOTOR BLANCO WHITE AZUL BLUE ROJO RED AMARILLO YELLOW...

Page 11: ...N 30 9kW 400V AC CADT N 45 10 5kW 400V AC CADT N 55 12kW 400V AC CADT N 80 18kW 400V AC CADB N 05 2kW 230V AC CADB N 08 3 5kW 230V AC CADB N 12 3 5kW 230V AC CADB N 18 6kW 400V AC CADB N 23 6kW 400V A...

Page 12: ...W 400V AC CADT N 45 10 5kW 400V AC CADT N 55 12kW 400V AC CADT N 80 18kW 400V AC CADB N 05 2kW 230V AC CADB N 08 3 5kW 230V AC CADB N 12 3 5kW 230V AC CADB N 18 6kW 400V AC CADB N 23 6kW 400V AC T2 S2...

Page 13: ...l ctrica pero con la posibilidad de instalar ba ter a de agua de post calentamiento en con guraci n de instalaci n remota doble pared de aislamiento y con by pass Los ujos de aire indicados en estas c...

Page 14: ...CADB CADT N DI 05 08 12 18 23 30 45 55 80 DH BP MODELOS CADB CADT N DI 05 08 12 18 23 30 45 55 80 EH BP MODELOS CADB CADT N DI 05 08 12 18 23 30 45 55 80 GH BP 7 5 MODELOS CADB CADT N DC 05 08 12 18...

Page 15: ...bater a de agua de post calentamiento y con by pass Los ujos de aire indicados en estas con guraciones NO pueden ser intercambiados en funci n de la instalaci n El instalador deber tener en cuenta la...

Page 16: ...r el mismo modi cando la posici n de los pies de soporte y a su vez tambi n tendremos que modi car la posici n de la bandeja recoge agua seg n la con guraci n elegida MODELOS CADB CADT N D 05 08 12 18...

Page 17: ...de agua de post calentamiento y sin by pass Los ujos de aire indicados en estas con guraciones NO pueden ser intercambiados en funci n de la instalaci n El instalador deber tener en cuenta la correcta...

Page 18: ...en la cara exterior del panel situado en el equipo 3 2 Fijar los escudos ciegos en el panel que hemos retirado al principio para tapar los agujeros 1 1 Retirar los paneles del lateral de entrada sali...

Page 19: ...19 4 1 Girar la bater a 4 2 Introducir la bater a por el carril 4 3 Apretar los tornillos aprisionando la bater a 5 Fijar los paneles cerrando el equipo 8 BY PASS 8 1 UBICACI N DEL SERVOMOTOR...

Page 20: ...n de control del estado de ensuciamiento de los ltros Cuando sea necesaria la sustituci n de los ltros aparecer un mensaje de alarma en el display del equipo La ubicaci n de los registros para manteni...

Page 21: ...a del intercambiador Ca da de rendimiento despu s de un periodo de funcionamiento aceptable Fuga en el circuito antes y o despu s del ventilador Rodete da ado Veri caci n del circuito y restauraci n d...

Page 22: ...5 3 CADB CADT N DI 05 08 12 18 23 30 45 55 80 A D H models 32 7 5 4 CADB CADT N DI 05 08 12 18 23 30 45 55 80 A D H BP models 33 7 5 5 CADB CADT N DC 05 08 12 18 23 30 45 55 80 A D H models 33 7 5 6...

Page 23: ...rovided in the Machine Directive This manual contains information for all personnel exposed to these hazards with the aim of preventing possible harm or damage due to faulty handling or maintenance Al...

Page 24: ...ed between all points of support to prevent deformation The installer must make sure that the ceiling structure and the securing elements can bear the weight of the device taking into account that it...

Page 25: ...N D 05 650 650 360 180 178 200 CADB CADT N D 08 850 850 360 180 228 250 CADB CADT N D 12 1050 1050 500 250 278 315 CADB CADT N D 18 1150 1150 500 250 303 355 CADB CADT N D 23 1300 1300 530 265 340 35...

Page 26: ...r follow this procedure Installation two filters 1 Loosen the two sets of filter support brackets 2 Loosen the two sets of filter support brackets 3 Fit the second filter ensuring that the direction o...

Page 27: ...h of the high points in the installation Auto filter valve to keep water in the hydraulic system at all times Pressure to detect the lack of water pressure Shut off valves must be installed at each co...

Page 28: ...ES VOLTAGE REGULATOR NEGRO BLACK AZUL BLUE AMARILLO VERDE YELLOW GREEN MARR N BROWN N L MOTOR N L 230V NEGRO BLACK AZUL BLUE AMARILLO VERDE YELLOW GREEN MARR N BROWN MOTOR Models 05 and 08 7 2 CONNECT...

Page 29: ...R N BROWN MOTOR Models 45 and 55 FACTORY WIRING T S R TP TP 400V ROJO RED ROJO RED NEGRO BLACK AZUL BLUE MARR N BROWN AMARILLO VERDE YELLOW GREEN AMARILLO YELLOW BLANCO WHITE VERDE GREEN T S R TP TP 2...

Page 30: ...AC CADB N 08 3 5kW 230V AC CADB N 12 3 5kW 230V AC CADB N 18 6kW 400V AC CADB N 23 6kW 400V AC CADB N 30 9kW 400V AC CADT N 45 10 5kW 400V AC CADT N 55 12kW 400V AC CADT N 80 18kW 400V AC 2 R 2 S 2 T...

Page 31: ...CADB N 08 3 5kW 230V AC CADB N 12 3 5kW 230V AC CADB N 18 6kW 400V AC CADB N 23 6kW 400V AC CADB N 30 9kW 400V AC CADT N 45 10 5kW 400V AC CADT N 55 12kW 400V AC CADT N 80 18kW 400V AC 2 R S 2 T 1 R 1...

Page 32: ...electric heater but with the possibility of install ing a water coil for post heating in remote installation con guration with a double insulation wall and with a by pass The air ows indicated in the...

Page 33: ...ADB CADT N DI 05 08 12 18 23 30 45 55 80 DH BP MODELS CADB CADT N DI 05 08 12 18 23 30 45 55 80 EH BP MODELS CADB CADT N DI 05 08 12 18 23 30 45 55 80 GH BP MODELS 7 5 CADB CADT N DC 05 08 12 18 23 30...

Page 34: ...tions CANNOT be changed according to the installation The installer must take into account the correct connection of the evacuation system for water produced by condensation See section 7 3 3 Do not p...

Page 35: ...ing the position of the support feet and at the same time it will also be necessary to modify the position of the water collection tray according to the chosen con guration CADB CADT N D 05 08 12 18 2...

Page 36: ...ating water coil and without by pass The air ows indicated in these con gurations CANNOT be changed according to the installation The installer must take into account the correct connection of the eva...

Page 37: ...e coil 3 1 Remove both covers situated on the opposite side The covers are located on the inner and outer side of the panel 1 2 Remove the side panels 2 2 Pull out the coil 3 2 Fix the previously remo...

Page 38: ...38 4 1 Turn the coil 4 3 Tight up the screws holding the coil 4 2 Introduce the coil to the mounting rail 5 Mount the loose panels 8 BY PASS 8 1 LOCATION OF THE SERVOMOTOR...

Page 39: ...control incorporates a function of supervision of the lters clogging When the lter replacement is required the display shows an alarm message The registers ubication for lters maintenance depends on...

Page 40: ...the circuit and or replacement of the fan There is water inside the unit Drain clogged or wrongly dimentioned Check if exists a body object obstructing the passage of water and remove it Verify that t...

Page 41: ...T N D 05 08 12 18 23 30 45 55 80 CH BP 51 7 5 3 Mod les CADB CADT N DI 05 08 12 18 23 30 45 55 80 A D H 51 7 5 4 Mod les CADB CADT N DI 05 08 12 18 23 30 45 55 80 A D H BP 52 7 5 5 Mod les CADB CADT N...

Page 42: ...a t r alis e comme pr vu dans la Directive Machines Les dispositifs de protection ne doivent pas tre enlev s sauf en cas d absolue n cessit Dans ce cas des mesures appropri es seront imm diatement ado...

Page 43: ...ec une surface plane Il est essentiel que le poids de l appareil soit distribu sur tous les points d appui a n d viter les d formations L installateur doit s assurer que la structure du plafond et sa...

Page 44: ...60 180 228 250 CADB CADT N D 12 1050 1050 500 250 278 315 CADB CADT N D 18 1150 1150 500 250 303 355 CADB CADT N D 23 1300 1300 530 265 340 355 CADB CADT N D 30 1500 1500 530 265 390 400 CADB CADT N D...

Page 45: ...proc dure indiqu e Installation du deux filtres 1 Desserrer les crous papillon maintenant les deux supports porte filtre 2 Retirer les supports porte filtre 3 Installer le second l endroit pr vu S ass...

Page 46: ...s d air au niveau de tous les points hauts de l installation Valve de remplissage automatique pour Ne jamais laisser l installation hydraulique sans eau Pressostat pour d tecter l absence de pression...

Page 47: ...ORDEMENT DES MOTEURS C BLAGE USINE ALIMENTATION DIRECTE C BLAGE AVEC VARIATEUR DE TENSION TROIS FILS NOIR BLEU JAUNE VERT MARRON N L MOTOR N L 230V NOIR BLEU JAUNE VERT MARRON MOTOR Mod les 05 et 08 L...

Page 48: ...AUNE VERT ROUGE JAUNE BLANC BLEU MARRON MOTOR Mod les 45 et 55 C BLAGE USINE T S R TP TP 400V ROUGE ROUGE NOIR BLEU MARRON JAUNE VERT JAUNE BLANC VERT T S R TP TP 230V ROUGE ROUGE NOIR BLANC BLEU JAUN...

Page 49: ...CADB N 05 2kW 230V AC CADB N 08 3 5kW 230V AC CADB N 12 3 5kW 230V AC CADB N 18 6kW 400V AC CADB N 23 6kW 400V AC CADB N 30 9kW 400V AC CADT N 45 10 5kW 400V AC CADT N 55 12kW 400V AC CADT N 80 18kW 4...

Page 50: ...2kW 230V AC CADB N 08 3 5kW 230V AC CADB N 12 3 5kW 230V AC CADB N 18 6kW 400V AC CADB N 23 6kW 400V AC CADB N 30 9kW 400V AC CADT N 45 10 5kW 400V AC CADT N 55 12kW 400V AC CADT N 80 18kW 400V AC R2...

Page 51: ...23 30 45 55 80 CH Mod les double peaux sans batterie de chauffage et sans by pass Les ux d air indiqu s pour cette con guration peuvent tre intervertis en fonction de l installation Dans ce cas bien...

Page 52: ...S CADB CADT N DI 05 08 12 18 23 30 45 55 80 DH BP MOD LES CADB CADT N DI 05 08 12 18 23 30 45 55 80 EH BP MOD LES CADB CADT N DI 05 08 12 18 23 30 45 55 80 GH BP 7 5 MOD LES CADB CADT N DC 05 08 12 18...

Page 53: ...Les ux d air indiqu s dans ces con gurations NE PEUVENT PAS tre interchang s Bien tenir compte de la position du tube d vacuation des condensats Voir paragraphe 7 3 3 Ne pas modi er la localisation de...

Page 54: ...3 3 MOD LES CADB CADT N D 05 08 12 18 23 30 45 55 80 BV MOD LES CADB CADT N D 05 08 12 18 23 30 45 55 80 AV BP MOD LES CADB CADT N D 05 08 12 18 23 30 45 55 80 EV BP MOD LES CADB CADT N D 05 08 12 18...

Page 55: ...e chauffage et sans by pass Les ux d air indiqu s dans ces con gurations NE PEUVENT PAS tre interchang s Bien tenir compte de la position du tube d vacuation des condensats Voir paragraphe 7 3 3 Ne pa...

Page 56: ...deux t les d obturation situ es sur le panneau oppos les t les d obturation sont situ es sur les faces internes et externes du panneau 1 2 Retirer les panneaux lat raux 2 2 Retirer la batterie 3 2 Fi...

Page 57: ...57 4 1 Tourner la batterie 4 3 Serrer les vis de xation de la batterie 4 2 Introduire la batterie dans le rail de montage 5 Remonter les panneaux 8 BY PASS 8 1 EMPLACEMENT DU SERVOMOTEUR...

Page 58: ...s le c ble du servomoteur est toujours dans le caisson de raccordement du ventilateur de retour AC 230V L N white Y2 black Y1 blue N 7 6 4 Servomotor Type 2 AC 230V L N white black 3 brown 2 blue 1 3...

Page 59: ...ensats obstru e ou mal dimension e V ri er si un objet ou autre obstrue l vacuation de l eau et le retirer V ri er que l vacuations des condensats existe et qu elle a t bien dimensionn e selon les ins...

Page 60: ...S P Sistemas de Ventilaci n S L U C Llevant 4 08150 Parets del Vall s Barcelona Tel 34 93 571 93 00 Fax 34 93 571 93 01 www solerpalau com Ref 7081007600...

Reviews: