point. To prevent night time tripping the
humidity sensing is inactive below 10ºC.
The integral pullcord or a remote switch
(e.g. light switch) will switch between
automatic humidity control and manual
override at HIGH speed. The Light
Emitting Diode (LED) indicator will be lit
for manual override. The LED will NOT
light under automatic humidity control,
even if the fan is running. There is no
permanent OFF position.
Use Fig.8 for wiring the manual override
by the integral pullcord. Use Fig.9 for
wiring the manual override to a remote
switch, when the pullcord must be
switched to the automatic position (LED
off) and the cord cut off close to the fan.
The humidity control is factory set to
switch on at about 72% RH.
To LOWER the set -point use a small
screwdriver to turn the adjuster ANTI -
CLOCKWISE, Fig.11. This makes the
controller MORE sensitive to RH, i.e. it
will come on at a lower RH.
To RAISE the set -point use a small
screwdriver to turn the adjuster
CLOCKWISE, Fig 10.
This makes the controller LESS sensitive
to RH, i.e. it will come on at a higher RH.
NOTES
:
1. Upon installation it is possible that the
humidity control will make the fan run
continuously until it has acclimatized to
the environment.
2. The fan uses a
“
soft start
”
feature i.e.
the motor will take several seconds to
reach speed.
Maintenance
IMPORTANT:
Before manipulating the
ventilator, make sure it is disconnected
from the mains supply even if it has
previously been switched off. Prevent the
possibility of anyone else connecting it
while it is being manipulated.
The extractor needs only a periodical
cleaning using a cloth lightly impregnated
with a soft detergent.
After Sales Service
We recommend you not to try to dismantle
or remove any other parts than those
mentioned as any tampering would
automatically cancel the S&P guarantee. If
you detect any fault, contact your S&P
dealer.
Recycling
EEC Standards, together with the
responsibility we should assume with future
generations in mind, oblige us to recycle all
the materials we can. Therefore, please
deposit all left-over material and packaging
in their corresponding recycling containers
and hand in the replaced machines to the
nearest handler of this type of waste
product.
S&P reserves the right to alter
specifications without notice
Summary of Contents for EBB-175
Page 2: ......
Page 3: ...Fig 5 Fig 4 Fig 3 Fig 1 5 1 5 2 Fig 2...
Page 4: ...N L N L N L N L N L Fig 6 Fig 7 Fig 10 Fig 11 Fig 8 Fig 9...
Page 29: ...EBB EBB ISO 9001 EBB 2 1 M HM 2 1 100 3 100 4 5 1 5 2...
Page 30: ...EBB 3 EBB S 6 7 EBB M 8 EBB DV 8 EBB 250 DV 9 EBB T 9 10 20 11 EBB HM...
Page 31: ...10 C 8 9 72 11 10 1 2 Soler Palau Soler Palau...
Page 32: ...EBB EBB ISO 9001 S P EBB 1 A 115mm 2 100 mm...
Page 33: ...3 4 1 4 2 150mm EBB EBB Class II 3 mm EBB EBB S 5 6 EBB M 7 EBB T 8 9 ON OFF 20 10...
Page 34: ...S P S P EEC S P...
Page 35: ...E ISO 9001 1 2 M HM 2 1 2 1 100 115 3 100 4...
Page 36: ...5 1 5 2 150 E 2 3 6 7 8 OFF FF FF 8 FF LOW HIGH Je 250 LOW HIGH OFF 9 LOW 9 10 20 11...
Page 37: ...EBB HM o LOW je 10 C HIGH OFF 8 72 RH 11 10 1 2...
Page 38: ......
Page 39: ......