English
Mounting instructions
1- Remove the fan body from the TD loosing the fixing screws of
the clamps.
2- Fix the support of the TD in the position where the extractor is to
be located and replace the fan body on the support taking into
account the direction of the flow indicated by the arrow.
3- Stretch and cut the flexible ducting at the required lengths for
the inlet and the outlet. The flexible ducting must completely
stretched.
4- Connect the flexible ductings to the TD and keep them fixed
with the adhesive tape.
5- Make a hole in the ceiling where the disc valve BOR-100 is to
be located. Separate the disc valve fron its duct coupling. Put
the flexible ducting through the hole in the ciling and connect it
to the duct coupling. Then replace the disc valve into the duct
coupling.
6- Make a hole in the wall or ceiling where the external grille
GR-100 is to be located. Put the flexible ducting through the
hole and connect it to the grille. Fit the external grille to the wall
or ceiling.
7- Connect the TD to the mains supply. The TD is an extractor
designed for a single phase supply as indicated on the rating
plate. The electrical installation should be made with a multipolar
isolating switch with an opening distance between contacts of
at least 3 mm.
Summary of Contents for TD-160/100 N SILENT
Page 1: ...KIT TD 160 100 KIT TD 160 100 T KIT TD 250 100 KIT TD 250 100 T...
Page 14: ......
Page 15: ......