2.2. DIMENSIONS

Size

Model

Dimensions (mm)

A

H

B

C

ØD1

ØD2

E

N

F

M

G

J

1

500

1076

1058

1032

1143

500

560

1009

12

12

4

14

50

560

560

620

630

630

690

2

710

1256

1058

1212

1325

710

770

1190

16

12

800

800

860

3

900

1455

1164

1412

1550

900

970

1390

16

15

1000

1000

1070

4

1120

1704

1394

1662

1815

1120

1190

1640

20

15

1250

1250

1320

Note

: weight of the particular unit is highly dependent on the in-built THGT motor.

3. INSTALLATION

3.1. PRIOR

The unit shall be installed, operated and serviced by competent and qualifi ed personnel, acting in accordance with all 
safety precautions applicable and as required by law, regulations and standards in the country applicable. 
THGT-HATCH is a roof unit. It may be installed onto a specifi c base or frame for this unit, or directly on the roof on (re-
quires JBS-HATCH mounting accessory). Consider the following for proper installation / safety:

•  The unit is electrically isolated before any work is started.
•  The unit’s HATCH cover is closed.
• Ensure suffi cient load capacity or strength to support the unit, wind effects, potential vibration…
•  Avoid severe wind or exposure to turbulence, dust, moisture and weather infl uences.
•  Surface must be solid, level, fl at and stable. Maximum roof fall shall not surpass 5º. 

3.2. INSTALLATION

The unit should be located in position, and assembled with any accessory equipment supplied, on relevant mounting, 
safety protection guards when applicable, on a solid level base to avoid any distortion and misalignment. Consider all 
necessary weatherproofi ng material or sealant when doing so.
Use the corner holes to affi x the unit to the base/frame on the roof with bolts or studs.
In case ductwork or accessories are to be connected to the intake side of the fan, the lower area of the unit presents a 
fl at fl ange provided with all necessary bolts. If fl exible connectors are to be installed, these shall be suitable for high 
temperature and must be taught to ensure no disruption to air fl ow or vibrations.

Summary of Contents for THGT-HATCH

Page 1: ...THGT HATCH EN ...

Page 2: ......

Page 3: ...t lifting 5 1 4 Storage 6 2 PRODUCT DESCRIPTION 6 2 1 Technical specifications 6 2 2 Dimensions 7 3 INSTALLATION 7 3 1 Prior 7 3 2 Installation 7 3 3 Electrical connection 8 4 COMMISSIONING 9 4 1 Prior 9 4 2 Start up 9 5 MAINTENANCE 9 6 PUTTING OUT OF SERVICE AND RECYCLING 10 ...

Page 4: ...competent persons and supervised by competent executive EC declaration of conformity is available as separate documentation to the fan product This Instruction manual is subject to modifications due to further technical developments of the fan described images and drawings may be simplified representations Due to improvements and modifications the fan operated may differ from the representations S P ...

Page 5: ...fan Do not remove safety protection guards or open access doors when fan is in operation or if hazardous substance is present Fan equipment should be electrically isolated and locked out before any access or work is started Refer to specific motor Instructions for further guidance Support If there is any problem with this unit contact your local S P Distributor S P reserve the right to make modifica...

Page 6: ...orized hatched enclosure and a mechanical extract fan the THGT HATCH is a roof mounted unit de signed for vertical smoke extract in fire conditions F400 120 certification for dual purpose as per EN 12101 3 0370 CPR 3963 Designed and built for ease of installation and commissioning energy savings and to withstand severe weather condi tions General specifications would include High corrosion resistance...

Page 7: ... The unit is electrically isolated before any work is started The unit s HATCH cover is closed Ensure sufficient load capacity or strength to support the unit wind effects potential vibration Avoid severe wind or exposure to turbulence dust moisture and weather influences Surface must be solid level flat and stable Maximum roof fall shall not surpass 5º 3 2 INSTALLATION The unit should be located in ...

Page 8: ...e no risk due to excessive temperature electrical heater Care may be needed when restarting fan after disruption to power supply Motor protection is to be provided by the installer Ensure the isolator is in OFF position before and after carrying out the connections in order to prevent sudden activation while the HATCH cover is closed Carry out the connections following the wiring diagram affixed to...

Page 9: ...onal National and Local regulations The unit should be electrically isolated before any work is started Fan equipment should be regularly cleaned frequency depending upon service load and application but no less than every 6 months Units installed in dusty environments may require more frequent cleaning to ensure safe operation Cleaning should include all areas where dust can accumulate in the fan...

Page 10: ...the unit from any duct connections and cover connections with plastic sheet to prevent exposure to any re sidue material in fan equipment and any contamination of ducts Dismantle and dispose in accordance with applicable National and International laws and regulations those parts who se service life has expired EEC legislation and our consideration of future generations mean that we should always ...

Page 11: ......

Page 12: ...S P SISTEMAS DE VENTILACIÓN S L U C Llevant 4 Polígono Industrial Llevant 08150 Parets del Vallès Barcelona España Tel 34 93 571 93 00 Fax 34 93 571 93 01 www solerpalau com Ref 9023087100 ...

Reviews: