Soft-touch
pop drain
(not-included)
fig. 1
fig. 2
-
The tubs weight may vary.
We recommend that the installation be
done by 2 people, as a security precaution.
-
Also, make sure to adopt a good posture when lifting the tub.
-
The diagrams in this guide are not construction plans; they are visual
aids.
•
Freestanding Bathtub Installation
1.
Ensure that the drain pipe in the floor is thoroughly
cleaned before the bath is placed into position and that
the waste hole is positioned correctly.
2.
Before the bath is fixed to the floor ensure that the
bath waste and the drainage pipe line up.
3.
Make sure all the surfaces are dry and stable before
installing the bathtub. This will ensure durable adhesion.
4.
Mark an area with tape on the floor where the bathtub
is going to stand with the template provided, the floor
can now be properly prepared.
5.
Position the bathtub and connect the waste, use a spirit
level to ensure that the bathtub is level. Fill the bathtub
with water, let the water run through the waste and
check for leaks.
6.
Apply sealant or silicone around the
base of the bathtub
to ensure that the bath does not
shift.
Tools
!