background image

Soft-touch 

pop drain

(not-included)

fig. 1

fig. 2

-

The tubs weight may vary.

 

We recommend that the installation be

done by 2 people, as a security precaution.

-

Also, make sure to adopt a good posture when lifting the tub.

-

The diagrams in this guide are not construction plans; they are visual

aids.

Freestanding Bathtub Installation

1.

Ensure that the drain pipe in the floor is thoroughly

 

cleaned before the bath is placed into position and that

 

the waste hole is positioned correctly.

2.

Before the bath is fixed to the floor ensure that the

 

bath waste and the drainage pipe line up.

3.

Make sure all the surfaces are dry and stable before

 

installing the bathtub. This will ensure durable adhesion.

4.

Mark an area with tape on the floor where the bathtub

 

is going to stand with the template provided, the floor

 

can now be properly prepared.

5.

Position the bathtub and connect the waste, use a spirit

 

level to ensure that the bathtub is level. Fill the bathtub

 

with water, let the water run through the waste and

 

check for leaks.

6.

Apply sealant or silicone around the

 

base of the bathtub 

to ensure that the bath does not

 

shift.

Tools

!

Reviews: