background image

1

2

1

Assemble the part as per the above. Ensure that 

the mains water supply is off before installation. 

Install the mixer housing (1) at a depth so that the 

finished surface is between the Min/Max distance 

in the drawing. 

Connect the Hot and Cold water supplies to the 

mixer*, then install the mixed water connections 

for the spout*. Cap off and pressure test to 

prevent any future leakage. Once the surrounding 

finishes have been applied (tiles/marble etc.) 

remove the front covers (2). Fit the face plate (3) 

onto the mixer body. Slide the handle (4) on to the 

cartridge pin and secure with the grub screw (5), 

then push on the cap (6). Open the water supplies 

and test. Fix the support for the spout (7) using 

teflon or hamp; fix the spout (8) on the support 

using the grub screw (9). 

* Before making any inlet pipe connections, all 

supply pipes MUST be thoroughly flushed to 

remove debris. Failure to do this could result in 

damage to the cartridge and components or low 

flow from the mixer.

Reviews: