24
Test Operation
The Test mode operation enables the machine to run each process while the machine runs all
the functions continuously on the normal operation.
Operation Procedures
Step 1: Push the "Test" Button on the control panel.
→
The Green lamp will light up, and show "o01" on the display.
Image of display for test "o01"
Step 2: Select the test number with the “Dial”
→
Test number will go up with clockwise, and the number goes down with counterclockwise
(The number is displayed with order of Test Number List at page 25. )
Step 3: Push the “Enter Button”.
→
Test mode is now ON, and the function starts working. The “Enter” Button is blinking
while the test is ON.
*
Push the “Enter Button” again to stop the test operation.
Please finish the test operation; otherwise it will not work for another test.
Step 4: Push the “Test” Button when you finish the test.
→
The Test Button lamp goes off.
The Display Window shows shirt counter and the normal operation is ready to work.
Test ON/OFF Lamp
Display Window
Step 2
Step 3
Step 1, 4
Before using the test operation, make sure there is no one working
near the machine.
WARNING
Test No.
Caution
Summary of Contents for DF-100E-V3
Page 40: ...40 ...
Page 42: ...42 Front Diagram 1 Front Diagram REV 3 ...
Page 44: ...44 Rear Diagram 2 Rear Diagram REV 3 ...
Page 46: ...46 Switch Solenoid Valve Diagram 3 Switch Solenoid Valve Diagram REV 3 315 301 ...
Page 48: ...48 Switch Solenoid Valve Diagram 3 Switch Solenoid Valve Diagram REV 3 315 301 ...
Page 50: ...50 Steam Piping Diagram 4 Steam Piping Diagram REV 3 ...
Page 52: ...52 Cover Diagram 5 Cover Diagram REV 3 513 ...
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 61: ......
Page 62: ...DF 100E V3 Rev 6 2019 1 ...