34
Test Number List
Test No.
Test Item
Remarks
o 1
Magnetic Contactor for
Vacuum Motor
o 2
Magnetic Contactor for
Blower Motor
o 3
Shoulder Press Solenoid (No.3)
o 4
Tail Clamp Up/Down Solenoid
(No.4)
・
Buzzer sounds after 0.4 seconds from start to move
upper, and does after 0.7 seconds from start to move
lower, please adjust speed using buzzer.
o 5
Sleeve Arm Up/Down Solenoid
(No.5/No.21)
・
Buzzer sounds after 1.8 seconds from start to open,
and does after 2.0 seconds from start to close, please
adjust speed using buzzer.
o 6
Tail Clamp Solenoid (No.6)
・
Buzzer sounds after 0.4 seconds from start to close,
and does after 1.35 seconds from start to open, please
adjust speed using buzzer.
o 7
Left Cuff Clamp Solenoid
(No.7)
・
Buzzer sounds after 0.225 seconds from close to open,
and does after 0.2 seconds from open to close, please
adjust speed using buzzer.
o 8
Right Cuff Clamp Solenoid
(No.8)
・
Buzzer sounds after 0.225 seconds from close to open,
and does after 0.2 seconds from open to close, please
adjust speed using buzzer.
o 9
Front Press Transfer Solenoid
(No.9/No.10)
o 11
Tuck Press Solenoid (No.11)
・
Buzzer sounds after 1.3 seconds from start to close,
please adjust speed using buzzer.
o 12
Body Press Solenoid (No.12)
・
Buzzer sounds after 1.8 seconds from start to close
with Rear Press Head, and does after 5.0 seconds from
start to open, please adjust speed using buzzer.
o 13
Side Expander Solenoid
(No.13/No.22)
・
Buzzer sounds after 1.55 seconds from start to open,
and does after 1.4 seconds from start to close, please
adjust speed using buzzer.
o 15
Steam Injection Solenoid
(No.15)
・
It will work 0.3 seconds when steam button is ON.
o 18
Neck Clamp Solenoid (No.18)
o 23
Buzzer
・
Beware of Test No.9, the Front Press Head will move to left when the test is ON.
CAUTION
Summary of Contents for LP-570E-V2
Page 54: ...54 Motor Operation Diagram 1 Motor Operation Diagram REV 4...
Page 56: ...56 Air Piping 1 2 Air Piping 1 REV 3 3DLP570E V2 052 2...
Page 58: ...58 Air Piping 2 3 Air Piping 2 REV 3 3DLP550J V2 053 6...
Page 60: ...60 Air Piping 3 4 Air Piping 3 REV 3 3DLP550J V2 054 6...
Page 62: ...62 Steam Piping 5 Steam Piping REV 3 3DLP570E V2 055 1...
Page 64: ...64 Control Box Switch Diagram 6 Control Box Switch Diagram REV 3 3DLP550J V2 056 6...
Page 66: ...66 Cover Diagram 7 Cover Diagram REV 3 3DLP570E V2 057 3...
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ...LP 570E V2X Rev 6 2019 6 1 2 B...