35
Test No
Test Item
Remarks
Dip Switch
You can check and change the DIP switch setting.
Please see “DIP Function” on page 40.
Press the Counter Clear Button to finish.
Service timer (Volume)
You can check and change the Volume function.
Please see “Volume Function” on page 39.
Press the Counter Clear Button to finish.
Panel Display Test
By turning Set/Select Dial, you can check if the Display
Window properly shows various numbers.
Panel Button Test
By pressing each Button on the Operation Panel, you can
check if each button properly works. The green light goes
ON.
Input Test
1
Test for Conduction for each sensor and each button.
* Test of Emergency Switch & Safety Guards not available.
Input Test
2
It indicates if the input signal is On or OFF.
* Test of Emergency Switch & Safety Guards not available.
Cover Counter
Body pressing time after changing the body cover.
※
After cover change, be sure to reset the cover counter.
(Refer to the 27 pages for the reset instructions.)
Press Counter
Body life time accumulated pressing time. (Cannot reset)
About the display of cover counter and press counter
Maximum counter is 9,999,999.
The counter shows twice due to the limited space of Display Window. First it shows
upper 3 digits. Turn the Set/Select Dial to the right next. It shows lower 4 digits next.
First digit/letter is a sign to identify Cover Counter or Press Counter.
Below contains a diagram of how this works.
Upper 3 digits
Lower 4 digits
Example of Maximum Counter
Example of Cover Counter: 9,999 times
Example of Press Counter: 12,000 times
Example of Cover Counter: 25,000 times
Test No.
/
Sign Letter
Covr
:
Cover Counter
PrSS
:
Press Counter
Summary of Contents for LP-570E-V2
Page 54: ...54 Motor Operation Diagram 1 Motor Operation Diagram REV 4...
Page 56: ...56 Air Piping 1 2 Air Piping 1 REV 3 3DLP570E V2 052 2...
Page 58: ...58 Air Piping 2 3 Air Piping 2 REV 3 3DLP550J V2 053 6...
Page 60: ...60 Air Piping 3 4 Air Piping 3 REV 3 3DLP550J V2 054 6...
Page 62: ...62 Steam Piping 5 Steam Piping REV 3 3DLP570E V2 055 1...
Page 64: ...64 Control Box Switch Diagram 6 Control Box Switch Diagram REV 3 3DLP550J V2 056 6...
Page 66: ...66 Cover Diagram 7 Cover Diagram REV 3 3DLP570E V2 057 3...
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ...LP 570E V2X Rev 6 2019 6 1 2 B...