4
1. Left Side Panel 2. Digital control panel 3. Front Panel
4. Bottom Panel 5. Bench Heater Panel 6. Bench Panel
7. Right Side Panel 8. Back Panel 9. Top Panel
10. Color light 11. Reading light 12. Cup holder
13. Radio/mp3 player
●
●
●
Installation Instructions
Assembly of the sauna requires at least 2 people to complete.
Please read the instruction thoroughly before assembly, then install the sauna according to the
following steps:
(1) Place bottom panel
Place the Bottom Panel on the dry and high ground, and avoid water and high moisture.