VERONA RS
02-2014
EN
Instructions for use and maintenance
8 / 29-EN
A
B
C
2TCS
3TCS
A
820 mm
1050 mm
B
610 mm
610 mm
C
590 mm
590 mm
4 - TECHNICAL DATA
5. UNPACKING AND POSITIONING
WARNING: unpacking and position-
ing operations must be performed
by a specialized and authorized
technician.
In order to prevent risks of contam-
ination, we recommend unpacking
the equipment only when it is time
to install it.
Units
2 TCS
3 TCS
Boiler capacity
litres
8.6
14
Net weight
kg
68
85
Gross weight
kg
74
91
Power supply voltage
V
120
220-240 1N~
380-415 3N~
Boiler heating element power (230V)
kW
3.5
Small boiler heating element power (230V)
kW
0.5
Unit heating element power
kW
0.2
Cup heating plate heating element power
kW
0.2
0.25
Electric pump power
kW
0.2
Total power
kW
5650
6400
Boiler operating pressure
Bar/MPa
0.8 ÷ 1 / 0.08 ÷ 0.1
Mains water pressure
Bar/MPa
4 / 0.4
Coffee dispensing pressure
Bar/MPa
0-9 / 0.8-0.9
Operating temperature
°C
5 ÷ 35
5.1 - UNPACKING THE MACHINE
1) Always check the conditions of the package: inform
the carrier if damaged.
2) Open the top part of the package and lower the
tabs.
3) Open the clear film and lift the machine HOLDING
IT BY ITS BASE.
Pull out the accessories: supplies and technical
documentation (manuals).
4) The elements of the package (box, clear film, metal
staples, etc.) can cut or injure if not handled with
care or used improperly; keep away from children
or unsuitable persons.