105
C-6 Operation
1.
Battery conditioning is automatic. There are no manual procedures for battery conditioning or
preconditioning to be performed by the user.
2.
In order to make sure of all the capacity is available for your battery cells, allow the battery cell to be fully
charged when installed for the first time. The first time charge of a battery cell takes about 24 hours to
complete.
C-7 Changing the Battery Backup Module
At some point, the LI-ION battery will no longer accept a charge properly. LI-ION battery life expectancy is anywhere
from approximately 1 to 5 years.
1.
Shutdown the operating system properly. Make sure that cache memory has been flushed.
2.
Disconnect the BBM cable from 12Gb/s SAS RAID controller’s battery connector.
3.
Disconnect the battery pack cable from JP2 on the BBM.
4.
Install a new battery pack and connect the new battery pack to JP2.
5.
Connect the BBM to 12Gb/s SAS RAID controller’s battery connector.
Note:
Do not remove BBM while system is running.
C-8 Battery Functionality Test Procedure:
1.
Writing amount of data into controller volume, about 5GB or bigger.
2.
Waiting for few seconds, power failed system by remove the power cable.
3.
Check the battery status, make sure the D9 is bright light, and battery beeps every few seconds.
4.
Power on system, and press Tab/F6 to login controller.
5.
Check the controller event log, make sure the event shows controller boot up with power recovered.
C-9 BBM Specifications
Mechanical
•
Module Dimension (W x H x D): 37.3 x 13 x 81.6 mm
•
BBM Connector: 2 x 6 box header
Environmental
•
Operating Temperature
o
Temperature: -00 C to +400 C
o
Humidity: 45-85%, non-condensing
•
Storage Temperature
Summary of Contents for ES208X12HP
Page 1: ......