9
800.533.7533 | Santa-Fe-Products.com
Santa Fe Oasis105 Installation & Operation Instructions
Basement/Crawl Space Installation
1. The Oasis105 must operate in an enclosed area to be most effective. Close all exterior vents, doors, windows,
and other outside openings to the space. The effectiveness of the dehumidifier depends on the rate at which new
moisture-laden air enters the room.
2. Place dehumidifier in a central location that does not restrict the airflow of the air intake and air outlet.
3. The dehumidifier must be installed on a level floor to ensure water drains out of the unit correctly.
4. There should be a minimum of 14 inches clearance around the dehumidifier. The unit will produce heat while in
operation and should not be operated in an enclosed small space like a closet unless it is ducted.
The Oasis105 is designed to operate between 49 °F and 115 °F. If the inlet air temperature is out of this range, the unit
will display an error code and not operate.