For Proper Operation
7
§
§
3
3
.
.
3
3
W
W
i
i
r
r
i
i
n
n
g
g
P
P
r
r
e
e
c
c
a
a
u
u
t
t
i
i
o
o
n
n
s
s
* Installation must be done in accordance with the National Electric Code Articles 110-17 and 110-18.
(1) When the AC input power is single-wire grounded, always connect the ground phase to the W
terminal (S phase) side on the UPS. See §6.3 “Input Plug Connection” for details.
(2) As far as possible, do not ground the output (load) side. If you must make a single-wire grounded
connection, always connect the ground phase to the W terminal (V phase) side on the UPS. (This is to
prevent short-circuiting by the ground.) See §9 “Load Devices Connection” for details.
§
§
3
3
.
.
4
4
U
U
s
s
a
a
g
g
e
e
P
P
r
r
e
e
c
c
a
a
u
u
t
t
i
i
o
o
n
n
s
s
(1) Never short-circuit the output terminals.
Doing so causes protective functions to activate or circuit breakers to trip, preventing output.
(2) Unsuitable load devices
Do not connect laser printers, plain paper fax machines, copy machines, or overhead projectors as
load devices. Such devices typically include heating elements that draw high current. This may cause
an overload that could prevent battery backup operation when an outage occurs, and could damage
the UPS.
(3) Power supply environment
If the UPS is used in an environment subject to long and frequent power outages (more than once a
week), the batteries may not receive sufficient charge, which could result in foreshortened battery
life and premature battery failure
(4) If the UPS is not operated for a long period, the batteries may require recharging. If the batteries in
the UPS are left uncharged, their service life will be greatly foreshortened. Recharge (refresh charge)
in accordance with the UPS storage environment as shown in the table below. See §8.2 “UPS Charge”
for details.
Operation
Storage Temperature
Charge Interval
A11H***U011
A11H***U111
25°C
Once every 6 months
At least 24 hours
At least 36 hours
30°C
Once every 4 months
At least 24 hours
At least 36 hours
40°C
Once every 2 months
At least 24 hours
At least 36 hours
(5) Insulation testing
Before testing indoor wiring insulation, shut down the UPS and disconnect the input and output
cables. Conducting an insulation test with the UPS connected may damage electronic components
such as the built-in arrester.
(6) Rack support rails (not supplied) are required to mount the UPS on a rack. For details, contact your
supplier or Sanyo Denki representative.
①
Set
BATT MCCB
on the back panel of the UPS to “ON”.
②
Set
MAIN MCCB
on the back panel of the UPS to “ON”.
↓
Recharging starts.
③
Continue operation for at least hours specified in the table.
④
Set
MAIN MCCB
to “OFF” after the hours specified elapse.
Recharging
procedures
Summary of Contents for A11H
Page 1: ...Instruction Manual 120V Model 2kVA 3kVA Uninterruptible Power Supply M0008068...
Page 70: ...Blank page...
Page 71: ...Blank page...
Page 72: ......