Procedure Until Load Device Operation
20
§
§
7
7
.
.
P
P
r
r
o
o
c
c
e
e
d
d
u
u
r
r
e
e
U
U
n
n
t
t
i
i
l
l
L
L
o
o
a
a
d
d
D
D
e
e
v
v
i
i
c
c
e
e
O
O
p
p
e
e
r
r
a
a
t
t
i
i
o
o
n
n
The procedure outline until turning on the load devices is as follows.
Be sure to follow the procedure outline below to backup the load devices during power outage.
Check the default value of the user setting
⇒
pages 21 and 33 to 35
Perform the power outage simulation test
⇒
page 23
Start up the UPS
⇒
page 29
The backup function is available during power outage.
Test result: OK
Test result: NG
See “If power outage simulation test does not
finish properly, check the following points.” to
perform countermeasure.
⇒
page 24
Configure the user setting
⇒
User settings Guide
Charge the UPS
⇒
page 22
Connect the load devices
⇒
page 25
Turn on the load device power
⇒
page 30
When you do not change
the user setting, proceed
to next step.
When the default settings do not
configurate with your environment or
requirements, change the user settings.
Install the UPS
⇒
pages 26 to 28
Summary of Contents for A11H
Page 1: ...Instruction Manual 120V Model 2kVA 3kVA Uninterruptible Power Supply M0008068...
Page 70: ...Blank page...
Page 71: ...Blank page...
Page 72: ......