4
1
2
≤ 5/8 in.
(16 mm)
01
STEP 1 Cut Hole for Housing
CAUTION:
Avoid potential personal injuries and property damage!
●
Minimum drywall thickness 1/2 in. (13 mm).
●
Box must be mounted between studs that are at least 16 in. (406 mm) apart.
1. Locate the studs using an edge-to-edge stud finder. Verify the edges of the studs using an awl or thin nail. Mark the inner edges of the
studs with pencil.
2. The open area on the left of the template
01
should line up the the inner edge of the left stud. This will allow space for the placement of
a power box on the right side of the housing
02
. Level the template
01
and use a pencil to mark the open area of the template
01
.
02
Inside Wall - Top View
Summary of Contents for SA808
Page 13: ...13 ...
Page 17: ...17 ESPAÑOL ...