SY16C Excavator OMM
Machine Operation
SANY
Operation and Maintenance Manual — 0420
4-59
TABL
E OF
CONT
E
N
TS
INTRODUCTION
SAFE
T
Y
MACHIN
E
CONTROLS
MACHINE
OP
ERA
T
IO
N
MA
INTENANCE
SPEC
IFI
CA
TIO
N
S
OP
T
IO
N
A
L
EQUI
PMENT
Lifting the Machine
NOTE:
This lifting procedure applies to standard machines. Check the operating weight of the machine, See
“Lift Chart: Blade Down” on page 6-6.
1. Park the machine on firm, level ground, raise the dozer
blade, and swing the upper structure to the rear of the
machine.
2. Fully extend the arm cylinder and the bucket cylinder.
Raise the boom.
3. Place the hydraulic lockout control lever in the locked
(closed) position.
4. Turn the key to OFF and remove from the key switch.
5. Turn the battery disconnect switch to OFF and lock the
engine hood.
6. Cover the exhaust opening to prevent contamination.
7. Use wire ropes and a container spreader bar that have
adequate length to keep the machine free from damage.
8. Lift the machine 10 in.–12 in. (25 cm–30 cm) and
check its balance. If it is not balanced, lower the
machine to the ground and adjust the boom or dozer
blade positions.
WARNING!
• Never lift the machine with a person inside the canopy.
• Allow no one to stand close to or under a lifted machine.
• Make sure the wire ropes are rated to lift the machine.
• Always lift with the longitudinal centerlines of the upper structure and undercarriage
parallel to each other.
• Keep the hydraulic lockout control lever in the locked (closed) position to prevent
unexpected movement of the machine.
Failure to follow these warnings could result in death or serious injury.
Fig. 4-86
0002953
Fig. 4-87
0002955
Summary of Contents for SY16C
Page 2: ...Page Intentionally Blank ...
Page 207: ...Page Intentionally Blank ...