SY16C Excavator OMM
Maintenance
SANY
Operation and Maintenance Manual — 0420
5-51
TABL
E OF
CONT
E
N
TS
INTRODUCTION
SAFE
T
Y
MACHIN
E
CONTROLS
MACHINE
OP
ERA
T
IO
N
MA
INTENANCE
SPEC
IFI
CA
TIO
NS
OP
T
IO
N
A
L
EQUI
PMENT
Lubrication
Lubrication Points
Fig. 5-39
0005160
1
12
11
13
2
6
3
11
10
14
16
4
9
8
7
15
15
5
1) Arm cylinder rod end pin (page 5-52)
9) Boom swing cylinder base end pin (page 5-55)
2) Boom-arm connecting pin (page 5-52)
10) Dozer blade cylinder end pins (page 5-55)
3) Arm cylinder base end pin (page 5-53)
11) Bucket linkage pins (page 5-55)
4) Boom cylinder rod end pin (page 5-53)
12) Bucket cylinder rod end pin (page 5-56)
5) Boom cylinder base end pin (page 5-53)
13) Bucket cylinder base end pin (page 5-56)
6) Boom pin (page 5-54)
14) Boom swing cylinder rod end pin (page 5-57)
7) Swing bearing (page 5-54)
15) Dozer blade linkage pins (page 5-55)
8) Swing gear (page 5-54)
16) Boom swing pin (page 5-57)
Summary of Contents for SY16C
Page 2: ...Page Intentionally Blank ...
Page 207: ...Page Intentionally Blank ...