Machine Operation
SY50U Excavator OMM
4-58
Operation and Maintenance Manual — 0120
SANY
9. Use wire ropes and a container spreader bar that have
adequate length to keep the machine free from damage.
10. Lift the machine 10 in.–12 in. (25 cm–30 cm) and
check its balance. If it is not balanced, lower the
machine to the ground and adjust the boom or dozer
blade positions.
Fig. 4-80
0002955