Introduction
Thank you for your purchasing of this equipment (UPS).
SAVE THESE INSTRUCTIONS
This Manual contains important information for Model ASD“ ”U that should be followed
during installation and maintenance of the UPS and batteries.
Read this manual to work safely, and to use the UPS correctly before the work of installation
and maintenance.
This unit is intended for installation in a temperature-controlled, indoor area free of conductive
contaminants.
・
Operating temperature: 0 to 40
℃
UPS is an abbreviation of Uninterruptible Power Supply.
Table of contents
1 Safety
precautions
.....................................................
1
2
Notes for correct operation ..................................................... 6
2.1
Notes for input power supply
......................................
6
2.2
Notes for installation
.....................................................
7
2.3
Notes for handling
.....................................................
7
2.4
Setting of frequency
.....................................................
7
3
Confirmation of packing content
......................................
7
4 Outline
.....................................................
8
5
Outside dimensions and part names
......................................
9
5.1 Equipment
..................................................... 9
5.2
LCD, LED panel
.....................................................
10
5.3 Auxiliary
switch
..................................................... 11
5.4
Outside inter face
.....................................................
12
6 Installation
.....................................................
14
6.1 Environment
..................................................... 14
6.2 Delivery
..................................................... 14
6.3 Installation
space
..................................................... 14
6.4
Installation of equipment
.....................................................
15
7 Wiring
.....................................................
16
7.1
Wiring of terminal block
.....................................................
16
7.2 Connection
of
terminal block wiring
......................................
17
7.3
Connection of outside interface
......................................
17
8 Preparations
before
operation ......................................
18
9 Operating
procedures .....................................................
19
9.1
Starting of operation
.....................................................
19
9.2
Power failure operation check test
......................................
20
9.3
Stopping of daily operation ..................................................... 21
10
Maintenance and inspection .....................................................
22
10.1 Daily
inspection
..................................................... 22
10.2 Periodic
inspection
..................................................... 22
10.3 Replacement
parts
..................................................... 22
10.4 Maintenance of battery .....................................................
23
10.5 Replacement of battery .....................................................
24
11
Power Supply Maintenance Bypass
......................................
25
11.1 Switching the Supply from the Inverter to Maintenance Bypass
...... 25
11.2 Switching from Maintenance Bypass to Inverter Power
......
26
12
At sounding buzzer
.....................................................
27
13
Operation at emergency
.....................................................
28
14 Specifications
.....................................................
29
15
Guarantee of equipment
.....................................................
30
■
SANYO DENKI Co., Ltd. Head office, branch offices