18
-
8. Preparations before operation
Check the following items before starting operation.
①
No damage or deformation exists on the appearance of the equipment.
②
Required to connect to the power supply satisfying the input specifications.
③
Required “OUTPUT MCCB” breaker of Power distribution unit is “OFF”.
It’s inside front panel.
•
OUTPUT MCCB ----------- OFF
④
Required “MAINTENANCE BYPASS” breaker of Power distribution unit is “OFF”.
It’s inside front panel.
•
MAINTENANCE BYPASS ----------- OFF
⑤
Required all breakers of unit back are right place.
•
MAIN MCCB ---------------- OFF
•
BYPASS MCCB ------------ ON
⑥
Outside interface is to be set correctly.
•
Four short pins are all to be inserted to STATUS SETTING.
•
SETTING 1
:
OFF --- Stand alone mode (Normal)
:
ON ---- W/S Mode (in case setting up)
•
SETTING 2
:
OFF
Inside front panel
↑
OFF
ON
Equipment back
Note
Check outside interface of
the LCD unit.
Front panel is
removed with
pulling both sides.