- 15 -
8. Preparations
Before
Operation
Check the following items before starting operation.
①
Visually inspect the units to verify that there is no visible damage.
②
Connect the UPS to a utility power source that meets the input specifications.
③
Verify that the UNIT SW on all UPS Units is turned OFF.
UPS Unit – Rear
ON
OFF
UNIT SW
Verify OFF